Dublin City Council · 3159/21 · Permission

R139 and Hole in the Wall Road Junction

72 apartments13 storeysVeni Vidi Vici LimitedDonaghmede, Dublin City Council

42 under construction of 42 permitted homes (Q2 2026).

  1. 14 Mar 2022Approved
  2. 11 Apr 2022Appealed
  3. 10 Nov 2023Appeal: Approved with conditions
  4. 20 Nov 2023Final approval
  5. 18 Apr 2024Building started
  6. 8 Sept 2026Signed off
Status
Building started
Decision
Approved · 14 Mar 2022
Size
72 apartments · up to 13 storeys
Uses
residential, apartments
Applicant
Veni Vidi Vici Limited
Site
1,967 m²
Appeal
ACP 313307 · Approved with conditions

Building progress councils’ figures, Q2 2026

  1. 2023Approved
  2. 2024Building started
  3. 2026First homes signed off1 sign-off

42 under construction of 42 permitted homes (Q2 2026).

42
homes proposed
42
homes permitted
42
homes started on site
0
homes completed

completed · under construction · not started · 0 houses and 42 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 202542420
Q3 202542420
Q4 202542420
Q1 202642420
Q2 202642420

The scheme

Veni Vidi Vici Limited proposes the construction of a 7 to 13 storey building at the junction of the R139 Road and Hole in the Wall Road in Donaghmede. The development includes 72 apartments and the demolition of an existing single storey pump house. The project also provides for new pedestrian and vehicular entrances, car parking, and cycle parking.

it involves the construction of a 13 storey residential building

What the register says

Planning permission at a site (approx. 0.19 Ha) at a site which adjoins the former Columban Missionary's site and which is located at the junction of the R139 Road and Hole in the Wall Road, Donaghmede, Dublin 13. The proposed development comprises of the construction of a 7 to 13 storey building, accommodating 72 no. apartments (total GFA c. 7,550sq.m) all with private balconies / terraces as follows: 30 no. 1 bedroom apartments, 38 no. 2 bedroom apartments and 4 no. 3 bedroom apartments. All associated and ancillary site development landscaping and boundary treatment works including: demolition of existing single storey structure on site (c. 37.65 sq.m) (previously used a pump house) and existing site boundary. Formation of new pedestrian and vehicular entrance to R139 Road and new pedestrian entrance to Hole in the Wall Road. 44 no. ground level car parking spaces (of which 2 no. are accessible spaces); some of which are undercroft. 162 no. ground level cycle parking spaces (of which 2 no. are cargo bicycle spaces) some of which are undercroft. Bin storage area at ground level

Summary from the register record.

Planning timeline 7 steps

  • 14 Jul 2021
    Application lodged — Standard
  • 14 Mar 2022
    Council decision — Grant
  • 11 Apr 2022
    Appealed to An Coimisiún Pleanála — ABP-313307-22
  • 11 Oct 2023
    Commission decision — Granted
  • 20 Nov 2023
    Final approval
  • 18 Apr 2024
    Building started
  • 3 Jan 2029
    Approval runs out (estimate)

The site 1,967 m²

Boundary of R139 and Hole in the Wall Road Junction as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 5 applications in the last 10 years

Appeals inside the site 4 with An Coimisiún Pleanála

Building work started inside the site 1 commencement notice

Other big developments nearby within 2 km