Building: all 80 homes are under construction (Q2 2026).

4 storeysArdstone Homes LimitedRathfarnham, South Dublin County Council

Email me when the next phase is lodged

How the homes are counted80 permitted · 75 applied for
  • 80 homes permitted (the Dublin councils' housing pipeline, Q2 2026).
  • 75 homes applied for (the application on the planning register).
Status
Building started
Decision
Approved · 29 Apr 2024
Height
up to 4 storeys
Uses
residential, apartments, houses
Applicant
Ardstone Homes Limited
Site
2.19 ha

Building progress councils’ figures, Q2 2026

  1. 2024Approved
  2. 2025Building started
  3. 2026First homes signed off1 sign-off
80
homes permitted
80
homes started on site
0
homes completed

completed · under construction · not started · 38 houses and 42 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 202580180
Q3 202580460
Q4 202580460
Q1 202680800
Q2 202680800
Source and licence

The scheme

Ardstone Homes Limited proposes the construction of 75 residential units at White Pines, Stocking Avenue, Rathfarnham. The development consists of an apartment building, a duplex apartment building, and 38 terraced houses. The scheme includes associated car and cycle parking, infrastructure, and landscaping.

What the register says

Construction of 75 no. residential units in a mix of apartments, terraced housing and duplex apartment units comprising; an apartment building (Block A, c. 2,518 sq. m GFA), varying in height between 3 and 4 storeys and comprising 29 no. units (18 no. 1 bed units and 11 no. 2 bed units). A 3-storey duplex apartment building (Block B, c. 792 sq.m GFA) comprising 8 no. units (4 no. 2-bed, single storey apartments and 4 no. 3-bed, 2 storey duplex units). 38 no. terraced houses, with a mix of 24 no. 2 storey, 2 bed units and 14 no. 2 storey, 3 bed units. The development will also provide 85 no. car parking spaces (including 17 no EV spaces and 4 no. accessible spaces) and 84 no. cycle parking spaces. The main vehicular access to the scheme will be from Stocking Avenue, via White Pines Dale with 3 no. access points along the southern boundary of the site. An additional emergency vehicular access point will also be provided from Stocking Avenue, to the northeast of the site, facilitating access for emergency vehicles, pedestrians and cyclists. There will be an additional 3 no. pedestrian / cyclist access points from Stocking Avenue and 1 no. pedestrian / cyclist access points from White Pines Park on the western boundary of the site. The proposed development will also include piped infrastructure, 1 no. ESB sub station, public lighting, bin stores, green roofs on apartment buildings, rooftop PV panels on block A, boundary treatments and provision of public and private open space including hard and soft landscaping and all other associated site development works above and below ground level

Summary from the register record.

Planning timeline 5 steps
  • 13 Oct 2023
    Application lodged — Standard
  • 22 May 2024
    Council decision — Grant
  • 10 Jun 2024
    Final approval
  • 22 Apr 2025
    Building started
  • 24 Jul 2029
    Approval runs out (estimate)

The site 2.19 ha

Boundary of White Pines as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 10 applications in the last 10 years

Show 2 more
Appeals inside the site 3 with An Coimisiún Pleanála
Commencement notices inside the site 5

Other big developments nearby within 2 km

Everything within 1 km on the map →

Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.