North Harbour Cape Clear Island Co. Cork
Approved. Building started.
- 28 Jun 2017Received
- 2 Aug 2017Observations closed
- 22 Aug 2017Decision due
- 15 Sept 2017Building started
- Status
- Building started
- Decision
- Due 22 Aug 2017
- Council
- Cork County Council
- Type
- PERMISSION
- Site
- 1,118 m²
Live near North Harbour Cape Clear Island Co. Cork?
Everything else planned on your street, in one report.
Check my streetWhat’s proposed
Alterations to Duffy's Pier. The works will raise, widen and strengthen the pier and will include filling, sheet piling, reinforced concrete and associated works. Demolish an existing Control Building and construct a new Control building in its place to suit revised pier levels. The spine wall dividing the inner and outer basins will be altered locally so that the inner basin can continue to be closed off by stop logs in an emergency. The Planning Application will be accompanied by a Natura Impact Statement
Planning details
- Reference
- 17/402
- Local authority
- Cork County Council
- Status
- Commenced · register status “INCOMPLETED APPLICATION”
- Received
- 28 Jun 2017
- Observations close
- 2 Aug 2017 (closed 3356 days ago)
- Decision due
- 22 Aug 2017
- Decision
- Not decided
- Proposed development
- Alterations to Duffy's Pier. The works will raise, widen and strengthen the pier and will include filling, sheet piling, reinforced concrete and associated works. Demolish an existing Control Building and construct a new Control building in its place to suit revised pier levels. The spine wall dividing the inner and outer basins will be altered locally so that the inner basin can continue to be closed off by stop logs in an emergency. The Planning Application will be accompanied by a Natura Impact StatementAs published by the register.
- Site area
- 1,118 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 18 · 500 m · 5 years
- GrantedAonad 1, Páirc Ghnó Údarás na Gaeltachta, Baile Iarthach Thuaidh, Oileán Chléire, Co. Chorcaí
- WithdrawnAonad 1, Pairc Ghno Udaras na Gaeltachta, Baile Iarthach Thuaidh, Oilean Chleire, Co. Chorcai
- CommencedBaile Iarthach Thuaidh Oileán Cléire Co. Chorcaí
- CommencedCnocán an Choimhthigh Oileán Chléire Co. Chorcaí
- CommencedCnocán an Choimhthigh Oileán Chléire Co. Chorcaí
- WithdrawnCnocán an Choimhthigh Oileán Chléire Co Chorcaí
- CommencedPáirc Ghnó Údarás na Gaeltachta Baile Iarthach Thuaidh Oileán Chléire An Sciobairín
- CommencedBallyieragh North Cape Clear Island Co. Cork
Show all 18
- CommencedPáirc Ghnó Údarás na Gaeltachta Baile Iarthach Thuaidh Oileán Chleire An Sciobairín, Contae Chorcaí
- CommencedPáirc Ghnó Údarás na Gaeltachta Baile an Iarthach Thuaidh Oileán Chléire, An Sciobairín
- CommencedPáirc Ghnó Údarás na Gaeltachta Baile Iarthach Thuaidh Oileán Chléire An Sciobairín
- CommencedPáirc Ghnó Údarás na Gaeltachta Baile Iarthach Thuaidh Oileán Chléire, An Sciobairin
- CommencedPáirc Ghnó Údarás Baile Iarthach Thuaidh Oileán Chléire An Sciobairín
- CommencedPáirc Ghnó Údarás na Gaeltachta Baile Iarthach Thuaidh Oileán Chléire An Sciobairín
- CommencedPáirc Ghnó Údarás na Gaeltachta Baile Iarthach Thuaidh Oileán Chléire An Sciobairín Co. Chorcaí
- CommencedBaile Iarthach Thuaidh Oileán Cléire Co. Chorcaí
- CommencedPairc Ghno Udaras na Gaeltachta Baile Iarthach Thuaidh Oilean Chleire An Sciobairin
- CommencedDuffy's Pier North Harbour Cape Clear Island Skibbereen, Co. Cork
Building started
- 15 Sept 2017 · Builder told the council work was starting (opted out of the finish sign-off) CN0031635GC
Zoning
Not zoned in the current plan.
Protections nearby 250 m
No mapped flood area nearby.
- Recorded monument · 7
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
17/402 is a planning application to Cork County Council for alterations to Duffy's Pier. The works will raise, widen and strengthen the pier and, received on 28 Jun 2017; the file is recorded as incompleted application.