Ballyspillane West Gortacrue Carrigogna Midleton, Co. Cork
Declared invalid.
- 23 Sept 2021Received
- 17 Nov 2021Decision due
Planning details
- Status
- Withdrawn or invalid
- Decision
- Due 17 Nov 2021
- Reference
- 21/6612
- Received
- 23 Sept 2021
- Site
- 3.17 ha
What’s proposed
3.43km of grid connection infrastructure on the public road to connect the approved Ballyspillane West Solar Farm (Planning Reference 175498) to the Midleton 110kV ESB Substation, comprising the laying of underground electricity cables and associated infrastructure and horizontal directional drilling.
Show all
The proposed development will also include a customer substation which is proposed to relocate the substation consented within the associated solar farm development (PA Ref: 175498). The ESBN MV customer substation is to be located near the site entrance to the east, to align with the connection route to the national grid. Based on new ESB Networks design standards, two options have been considered for the design of the proposed substation. A Natura Impact Statement will be submitted to the Planning Authority with the application
1 other application within 500 m in five years
Get the full reportNearby 1 · 500 m · 5 years
Homes nearby
- For saleBallyspillane West, Midleton, Dungourney, Co. Cork, P25 FN82
- For saleBroom Heights, Midleton, Co. Cork
- For saleBroom Heights, Midleton, Co. Cork
- For sale85 Meadowlands, Broomfield Village, Midleton, Co. Cork, P25 VY96
- For sale9 Riverwalk, Tír Cluain, Midleton, Co. Cork, P25 F104
- For sale4 Cypress Circus, Broomfield Village, Midleton, Co. Cork, P25 NN29
Protections nearby 250 m
- Recorded monument · 5
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
21/6612 is a planning application to Cork County Council for 3.43km of grid connection infrastructure on the public road to connect the approved, received on 23 Sept 2021; the file is recorded as incompleted application.