Cork County Council · 21/6789

Ballyspillane West Gortacrue Carrigogna Midleton, Co. Cork

Approved in May 2022. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

  1. 14 Oct 2021Received
  2. 31 Mar 2022Conditional
  3. 10 May 2022Final approval
  4. 10 May 2027Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Conditional · 31 Mar 2022
Reference
21/6789
Received
14 Oct 2021
Site
3.18 ha

What’s proposed

3.43km of grid connection infrastructure on the public road to connect the approved Ballyspillane West Solar Farm (Planning Reference 175498) to the Midleton 110kV ESB Substation, comprising the laying of underground electricity cables and associated infrastructure and horizontal directional drilling.

Show all

The proposed development will also include a customer substation which is proposed to relocate the substation consented within the associated solar farm development (PA Ref: 175498). The ESBN MV customer substation is to be located near the site entrance to the east, to align with the connection route to the national grid. Based on new ESB Networks design standards, two options have been considered for the design of the proposed substation. A Natura Impact Statement will be submitted to the Planning Authority with the application

1 other application within 500 m in five years

Get the full report

Nearby 1 · 500 m · 5 years

Distance
Time

Explore this area on the map →

Homes nearby

Protections nearby 250 m

  • Recorded monument · 5
    Fulacht fia; Graveyard
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

21/6789 is a planning application to Cork County Council for 3.43km of grid connection infrastructure on the public road to connect the approved, received on 14 Oct 2021; permission was granted with conditions on 31 Mar 2022.