Ballyspillane West Gortacrue Carrigogna Midleton, Co. Cork
Approved in May 2022. No sign of building yet.
Start notices are matched from the national building control register; a start on site can be missed.
- 14 Oct 2021Received
- 31 Mar 2022Conditional
- 10 May 2022Final approval
- 10 May 2027Approval runs out
Planning details
- Status
- Approved
- Decision
- Conditional · 31 Mar 2022
- Reference
- 21/6789
- Received
- 14 Oct 2021
- Site
- 3.18 ha
What’s proposed
3.43km of grid connection infrastructure on the public road to connect the approved Ballyspillane West Solar Farm (Planning Reference 175498) to the Midleton 110kV ESB Substation, comprising the laying of underground electricity cables and associated infrastructure and horizontal directional drilling.
Show all
The proposed development will also include a customer substation which is proposed to relocate the substation consented within the associated solar farm development (PA Ref: 175498). The ESBN MV customer substation is to be located near the site entrance to the east, to align with the connection route to the national grid. Based on new ESB Networks design standards, two options have been considered for the design of the proposed substation. A Natura Impact Statement will be submitted to the Planning Authority with the application
1 other application within 500 m in five years
Get the full reportNearby 1 · 500 m · 5 years
Homes nearby
- For saleBallyspillane West, Midleton, Dungourney, Co. Cork, P25 FN82
- For saleBroom Heights, Midleton, Co. Cork
- For saleBroom Heights, Midleton, Co. Cork
- For sale85 Meadowlands, Broomfield Village, Midleton, Co. Cork, P25 VY96
- For sale4 Cypress Circus, Broomfield Village, Midleton, Co. Cork, P25 NN29
- For saleMill Road, Midleton, Co. Cork, P25 KW35
Protections nearby 250 m
- Recorded monument · 5
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
21/6789 is a planning application to Cork County Council for 3.43km of grid connection infrastructure on the public road to connect the approved, received on 14 Oct 2021; permission was granted with conditions on 31 Mar 2022.