Cork County Council · 23/5644

Ballynabointra Midleton Co. Cork

Approved in Nov 2023. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

What’s proposed

The development will consist of the installation of a replacement block production yard and block storage area within an application area of c.2hectares. The development will comprise of; 1) the construction of new block production yard, comprising a reinforced concrete ground bearing slab (c.7,155m2), 2) installation of sub-surface storm water drainage beneath the concrete slab which will discharge via a silt trap…

Show all

and hydrocarbon interceptor to the adjoining quarry floor (and to ground thereafter) and 3) provision of a hard standing (unpaved) area (c.2,950m2) for concrete block storage pending sale and dispatch off-site

  1. 11 Aug 2023Received
  2. 4 Oct 2023Conditional
  3. 10 Nov 2023Final approval
  4. 10 Nov 2028Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Conditional · 4 Oct 2023
Reference
23/5644
Received
11 Aug 2023
Site
1.98 ha

1 other application within 500 m in the last year

Get the full report

Nearby 1 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Protections nearby 250 m

  • Recorded monument · 1
    R130437
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

23/5644 is a planning application to Cork County Council for the development will consist of the installation of a replacement block production yard, received on 11 Aug 2023; permission was granted with conditions on 4 Oct 2023.