Cork County Council · 26/2426

Milebush Quarry, Ballynabointra and Burgesland, Midleton, Co. Cork, P25 NV27

No decision yet (was due 11 Nov).

What’s proposed

Permission for the backfilling of an exhausted quarry void (quarry registration ref: QR078) and acceptance, short-term storage and processing of construction and demolition (C&D) waste on-site, within an overall application area of circa (ca). 11.2 hectare (ha.).

Show all

The development will consist of the backfilling of the quarry void (ca. 4.9ha) to a level of ca. 27 metres above Ordnance Datum (mAOD) with either: 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stones, and river dredge spoil which will result in the proposed development operating as a soil recovery facility that requires a waste management licence from the Environmental Protection Agency (EPA); or 2) Soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product at its source of origin and transported as a by-product material to enable the site to be backfilled. The proposed C&D processing facility will cover an area of ca. 1.9ha and will operate under a waste management licence from the EPA. The development will also comprise of the construction of an inspection shed (ca.140m2) and ancillary improvements to drainage and landscaping. The development will utilise existing infrastructure on-site including weighbridge, wheelwash, garage, car parking and welfare facilities. The development will also include junction improvement works at the L7648 / N25 junction, located ca. 120m north of the quarry entrance. The application relates to development which involves an activity requiring a waste licence from the EPA. A planning permission of 20 years is being sought for the proposed development. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application

  1. 17 Sept 2026Received
  2. 22 Oct 2026Observations closed
  3. 11 Nov 2026Decision due

An email when it’s decided. After that, only if it’s appealed or building starts.

Planning details

Status
With the council, no decision yet
Decision
Due 11 Nov 2026
Reference
26/2426
Received
17 Sept 2026
Site
11.20 ha

5 other applications within 500 m in five years

Get the full report

Nearby 5 · 500 m · 5 years

Distance
Time

Explore this area on the map →

Homes nearby

Protections nearby 250 m

  • Recorded monument · 2
    Excavation - miscellaneous; R130437
Where this comes from

National planning feed (NPAD), fetched 7 Oct 2026, 01:19.

Source: National Planning Application Database · fetched 7 Oct 2026, 01:19
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.07 Oct 2026, 01:19open
Summary

26/2426 is a planning application to Cork County Council for permission for the backfilling of an exhausted quarry void (quarry registration ref, received on 17 Sept 2026; a decision is due by 11 Nov 2026.