Aughinida Coachford Co. Cork
Approved in Feb 2025. No sign of building yet.
Start notices are matched from the national building control register; a start on site can be missed.
- 5 Jul 2024Received
- 18 Dec 2024Conditional
- 4 Feb 2025Final approval
- 4 Feb 2035Approval runs out
Planning details
- Status
- Approved
- Decision
- Conditional · 18 Dec 2024
- Reference
- 24/5269
- Received
- 5 Jul 2024
- Site
- 4.23 ha
What’s proposed
A 10 year planning permission for a Grid Stability Development. The proposed development will comprise 2 no. control buildings, 120 no. containerised energy storage modules and associated plant and equipment, 20 no. power conversion system units, associated underground electrical ducting and electrical cabling to connect to a transformer/associated 110kV underground grid connection cabling to nearby Clashavoon…
Show all
substation (as previously permitted under Cork County Council reference 23/4541), access tracks, security fencing, landscaping, drainage and all associated ancillary development works and apparatus necessary to facilitate the proposed development. Access to the proposed development will be via an entrance from the L7477 local road to the south (previously permitted under Cork County Council reference 23/4541)
3 other applications within 500 m in five years
Open the reportNearby 3 · 500 m · 5 years
Protections nearby 250 m
- NIAH-recorded building · 1
- Recorded monument · 3
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
24/5269 is a planning application to Cork County Council for a 10 year planning permission for a Grid Stability Development. The proposed development, received on 5 Jul 2024; permission was granted with conditions on 18 Dec 2024.