Kilmore, Brinny, Innishannon, Co. Cork.
Withdrawn or invalid.
- 26 Aug 2026Received
- 30 Sept 2026Observations closed
- Status
- Withdrawn or invalid
- Decision
- Not yet
- Council
- Cork County Council
- Type
- Permission
- Site
- 3,694 m²
What’s proposed
Permission for the construction of a 449.8msq (including 77.1msq Mezzanine) purpose-built operational infrastructure facility, supporting essential civil engineering and utility services, including secure storage areas for plant, machinery, and other construction materials and tools required soley in connection with the applicant's civil engineering and utility contracting business, a revised vehicular entrance and gate, internal circulation areas, parking and operational hard standing, 10m x 7m external storage area, storing Clause 804 and pipe grit for emergency use, associated surface water drainage infrastructure, waste water treatment system to serve wc and all other ancillary site development works
Planning details
- Reference
- 26/2222
- Local authority
- Cork County Council
- Status
- Withdrawn or invalid · register status “Invalid - Case Closed”
- Received
- 26 Aug 2026
- Observations close
- 30 Sept 2026 (closed 4 days ago)
- Decision due
- No due date published
- Decision
- Not decided
- Proposed development
- Permission for the construction of a 449.8msq (including 77.1msq Mezzanine) purpose-built operational infrastructure facility, supporting essential civil engineering and utility services, including secure storage areas for plant, machinery, and other construction materials and tools required soley in connection with the applicant's civil engineering and utility contracting business, a revised vehicular entrance and gate, internal circulation areas, parking and operational hard standing, 10m x 7m external storage area, storing Clause 804 and pipe grit for emergency use, associated surface water drainage infrastructure, waste water treatment system to serve wc and all other ancillary site development worksAs published by the register.
- Site area
- 3,694 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 16 · 500 m · 5 years
- WithdrawnBrinny, Innishannon, Co.Cork
- AppealedKilmore, Brinny, Co. Cork
- GrantedBrinny, Innishannon, Co. Cork.
- GrantedKilmore Brinny Co Cork
- WithdrawnKilmore Brinny Co Cork
- WithdrawnKilmore Brinny Co Cork
- GrantedA site of c. 8.75 ha located at lands Brinny Innishannon Co.Cork
- GrantedKilmore Brinny Co Cork
Show all 16
Homes nearby
Zoning
Not zoned in the current plan.
Protections nearby 250 m
No mapped flood area nearby.
- NIAH-recorded building · 2
- Recorded monument · 4
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
26/2222 is a planning application to Cork County Council for permission for the construction of a 449.8msq (including 77.1msq Mezzanine), received on 26 Aug 2026; the file is recorded as invalid - case closed.