PlanningRegister.ie
Dublin City Council · 3361/19

St. Michael's College, Ailesbury Road, Dublin 4

Approved. Building started.

  1. 26 Jun 2019Received
  2. 29 Oct 2019Approved
  3. 21 Nov 2019Appealed
  4. 11 Dec 2019Appeal: Refused
  5. 17 Dec 2019Final approval
  6. 30 Nov 2020Building started
Status
Building started
Decision
Approved · 29 Oct 2019
Council
Dublin City Council
Type
Permission
Site
5.52 ha
Appeal
ACP 305971 · Refused

Live near St. Michael's College?

Everything else planned on your street, in one report.

Check my street

What’s proposed

PROTECTED STRUCTURE: The development will consist of works to both Primary (Junior) School and Post-Primary (Senior) School buildings. Works to the Junior School consist of partial demolition, material alterations, development and propose: The construction of a new 2 storey classroom block on the footprint of an existing play area providing: 6 no. new classrooms, pre-school classroom, staff room, associated resource rooms and reception with a new rooftop play area and two storey connection to the existing 2 storey school block. The demolition of existing single storey pre-fabricated classrooms and a single first floor classroom to the north facade of existing 2 storey school block; construction of a new single storey General Purpose Hall, 2 no classrooms, associated storage rooms, enclosed courtyard and biodiversity garden and reconstruction of 1st floor classroom with connection to existing 2 storey school block. Works to the Senior School consist of partial demolition, material alterations, new development and propose: The demolition of an existing prefab single storey swimming pool building and circulation staircase. Construction of new 2 storey extension to existing school comprising 4 no. Science Laboratories, associated preparation rooms, additional resource room along with a replacement circulation staircase; construction of first floor office and resource room over existing ground floor single storey classroom; construction of new student garden and seating areas. Provision of 2 new coach parking spaces within the campus boundary to south of pavilion building adjacent to Nutley Avenue Campus Entrance. All works situated within the curtilage of a protected structure, St. Michaels House

Planning details

Reference
3361/19
Local authority
Dublin City Council
Status
Commenced · register status “Appeal Decided”
Received
26 Jun 2019
Observations close
31 Jul 2019 (closed 2620 days ago)
Decision due
30 Oct 2019 · decided 29 Oct 2019
Decision
Grant permission on 29 Oct 2019
Proposed development
PROTECTED STRUCTURE: The development will consist of works to both Primary (Junior) School and Post-Primary (Senior) School buildings. Works to the Junior School consist of partial demolition, material alterations, development and propose: The construction of a new 2 storey classroom block on the footprint of an existing play area providing: 6 no. new classrooms, pre-school classroom, staff room, associated resource rooms and reception with a new rooftop play area and two storey connection to the existing 2 storey school block. The demolition of existing single storey pre-fabricated classrooms and a single first floor classroom to the north facade of existing 2 storey school block; construction of a new single storey General Purpose Hall, 2 no classrooms, associated storage rooms, enclosed courtyard and biodiversity garden and reconstruction of 1st floor classroom with connection to existing 2 storey school block. Works to the Senior School consist of partial demolition, material alterations, new development and propose: The demolition of an existing prefab single storey swimming pool building and circulation staircase. Construction of new 2 storey extension to existing school comprising 4 no. Science Laboratories, associated preparation rooms, additional resource room along with a replacement circulation staircase; construction of first floor office and resource room over existing ground floor single storey classroom; construction of new student garden and seating areas. Provision of 2 new coach parking spaces within the campus boundary to south of pavilion building adjacent to Nutley Avenue Campus Entrance. All works situated within the curtilage of a protected structure, St. Michaels House
As published by the register.
Site area
5.52 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name

Nearby 129 · 500 m · 5 years

Show all 129

Explore this area on the map →

Homes nearby

Development land nearby

From Buildable, our sister site for development land in Dublin.

See all development land near here →

Appeal

ACP 305971 · Leave to Appeal S37(6) · decided · Refused 11 Dec 2019
received by the Commission 21 Nov 2019 · board order

Building started

  • 11 Jul 2022 · Builder told the council work was starting CN0091276DC
  • 25 Jan 2022 · Builder told the council work was starting CN0085316DC
  • 6 Aug 2021 · Builder told the council work was starting CN0079755DC
  • 1 Dec 2020 · Builder told the council work was starting (seven-day notice) SN0005727DC
  • 30 Nov 2020 · Builder told the council work was starting (seven-day notice) SN0005728DC

Zoning

Zone Z2 - DEV PLAN 2022-2028

M3 — Neighbourhood centre

A local centre: shops, services and apartments over them, serving the surrounding housing.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

S5 — Sustainable neighbourhood infrastructure

Reserved for the schools, creches, community and health facilities a neighbourhood needs.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • Radon risk area · 1
    About 1 in 20 homes in this area is likely to have high radon levels
  • Recorded monument · 2
    Ritual site - holy well; R191846

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open
Summary

3361/19 is a planning application to Dublin City Council for pROTECTED STRUCTURE: The development will consist of works to both Primary (Junior), received on 26 Jun 2019; permission was granted on 29 Oct 2019.