57 Pembroke Road, Dublin 4
- 22 Oct 2024Received
- 10 Dec 2024Grant permission
- 31 Jan 2025Final grant
- 3 Jul 2026Commenced
- Status
- Commenced
- Decision
- Grant permission · 10 Dec 2024
- Council
- Dublin City Council
- Type
- Permission
- Site
- 932 m²
What’s proposed
PROTECTED STRUCTURE: 10 year permission . The development will consist of: (a) Fabric repair works: (i) Main Roof: Strip slates; salvage re-usable slates; dispose of fibre/asbestos slates. Salvage ridge and hip tiles and reinstate when roof is slated; Provide matching replacement for any missing or damaged beyond repair. Re- slate the roof using salvaged original natural stone slates on the outer slopes as far as possible and new matching natural stone slates on the inner slopes, on breathable membrane using treated battens. Strip all parapet and valley gutters; adjust, repair, and/or replace if necessary valley boarding to suit new copperwork. Lay new copper gutters. Repair, or if necessary replace, existing flashings and cover flashings. Re-form rainwater outlets. Repair roof structural timbers and wall-plates, including cutting and splicing any rotten timbers. Remove existing Velux type roof-lights and replace as indicated on drawings. Remove existing 'dormer type' access to roof, and replace with Velux type roof-light in the plane of the roof. Provide roof insulation; (ii) External walls: Brickwork to front elevation: Repair, or replace if necessary, damaged bricks. Rake out and repoint brickwork with lime mortar - wigged pointing to match original. Brickwork to rear elevation: Carry out minor repairs to brickwork and pointing. Rendered wall finishes: Carry out structural repairs to cracks as detailed on structural engineer's drawings: Hack off loose, damaged or hollow areas of render and re-render to match original; clean and re-decorate. Masonry walls: gently clean to remove surface dirt; complete minor repairs to Granite Ashlar and Chanelled Granite Ashlar walling and pointing. Provide all necessary lead flashings and cover flashings. Concrete frame to modern extension: Carry out repair works as detailed on structural engineer's drawings and make good. (iii) Parapet walls: Carry out all necessary remedial and structural repairs which become apparent after opening-up; Repair metalwork as necessary; redecorate. (iv) Chimney stacks: Carry out all necessary re- building/repair works including repointing wigged finish to match existing. (Extent of re-building to be determined by Conservation Architect after stacks are opened-up). Repair, or replace if necessary, damaged chimney pots to match originals; Repair or replace flashings as necessary. (v) Windows: carry out all necessary repairs to timber frames and sashes if feasible: If not feasible, replace windows on like for like basis by conservation specialist joinery manufacturer. Cills/ surrounds: Repair cracks in granite cills and fill all holes. Repair, or if necessary replace, rendered reveals, and apply new mastic joint with window frames. (vi) Railings/ Security Frames: Check all fixings/supports and repair as required; check for expansion where built into walls and repair as necessary including any cracks in the masonry walls. (vii) Boundaries: Repair front boundary railings and granite plinth as necessary: (viii) Rainwater disposal: Repair, or if necessary replace, rainwater goods; Clean out all gutters, hopper heads, rainwater pipes and leave water-tight and in good working order; re-decorate on completion as required. (b) Provide Electric Vehicle polemounted charge point in front car-parking area
4361/24 is a planning application to Dublin City Council for pROTECTED STRUCTURE: 10 year permission . The development will consist of: (a) Fabric, received on 22 Oct 2024; permission was granted on 10 Dec 2024.
Planning details
- Reference
- 4361/24
- Local authority
- Dublin City Council
- Status
- Commenced · register status “Decision Notice Issued”
- Received
- 22 Oct 2024
- Observations close
- 26 Nov 2024 (closed 657 days ago)
- Decision due
- 16 Dec 2024 · decided 10 Dec 2024
- Decision
- Grant permission on 10 Dec 2024
- Proposed development
- PROTECTED STRUCTURE: 10 year permission . The development will consist of: (a) Fabric repair works: (i) Main Roof: Strip slates; salvage re-usable slates; dispose of fibre/asbestos slates. Salvage ridge and hip tiles and reinstate when roof is slated; Provide matching replacement for any missing or damaged beyond repair. Re- slate the roof using salvaged original natural stone slates on the outer slopes as far as possible and new matching natural stone slates on the inner slopes, on breathable membrane using treated battens. Strip all parapet and valley gutters; adjust, repair, and/or replace if necessary valley boarding to suit new copperwork. Lay new copper gutters. Repair, or if necessary replace, existing flashings and cover flashings. Re-form rainwater outlets. Repair roof structural timbers and wall-plates, including cutting and splicing any rotten timbers. Remove existing Velux type roof-lights and replace as indicated on drawings. Remove existing 'dormer type' access to roof, and replace with Velux type roof-light in the plane of the roof. Provide roof insulation; (ii) External walls: Brickwork to front elevation: Repair, or replace if necessary, damaged bricks. Rake out and repoint brickwork with lime mortar - wigged pointing to match original. Brickwork to rear elevation: Carry out minor repairs to brickwork and pointing. Rendered wall finishes: Carry out structural repairs to cracks as detailed on structural engineer's drawings: Hack off loose, damaged or hollow areas of render and re-render to match original; clean and re-decorate. Masonry walls: gently clean to remove surface dirt; complete minor repairs to Granite Ashlar and Chanelled Granite Ashlar walling and pointing. Provide all necessary lead flashings and cover flashings. Concrete frame to modern extension: Carry out repair works as detailed on structural engineer's drawings and make good. (iii) Parapet walls: Carry out all necessary remedial and structural repairs which become apparent after opening-up; Repair metalwork as necessary; redecorate. (iv) Chimney stacks: Carry out all necessary re- building/repair works including repointing wigged finish to match existing. (Extent of re-building to be determined by Conservation Architect after stacks are opened-up). Repair, or replace if necessary, damaged chimney pots to match originals; Repair or replace flashings as necessary. (v) Windows: carry out all necessary repairs to timber frames and sashes if feasible: If not feasible, replace windows on like for like basis by conservation specialist joinery manufacturer. Cills/ surrounds: Repair cracks in granite cills and fill all holes. Repair, or if necessary replace, rendered reveals, and apply new mastic joint with window frames. (vi) Railings/ Security Frames: Check all fixings/supports and repair as required; check for expansion where built into walls and repair as necessary including any cracks in the masonry walls. (vii) Boundaries: Repair front boundary railings and granite plinth as necessary: (viii) Rainwater disposal: Repair, or if necessary replace, rainwater goods; Clean out all gutters, hopper heads, rainwater pipes and leave water-tight and in good working order; re-decorate on completion as required. (b) Provide Electric Vehicle polemounted charge point in front car-parking areaAs published by the register.
- Site area
- 932 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name
Full planning report for 53.33196, -6.23854
Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
- Short commencement notice CN0144247DC
Zoning at the site
Zone Z2 - DEV PLAN 2022-2028
Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
Designations within 250 m
OPW flood extent nearby — flag only (licence); floodinfo.ie.
- Radon risk area · 1
- Recorded monument · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 85210). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |