PlanningRegister.ie
Dublin City Council · WEB1740/25

110 & 114 Howth Road, Dublin 3

  1. 5 Apr 2025Received
  2. 11 Apr 2025Application declared inva
Status
Withdrawn or invalid
Decision
Application declared inva · 11 Apr 2025
Council
Dublin City Council
Type
Permission
Site
4,661 m²

What’s proposed

The development will consist of: 1. The demolition of 2 no. existing, detached residential dwellings on the subject site, 110, Howth Road, Dublin 3, D03 KV60 (single storey dwelling, 168.7 m2 GFA) and 114, Howth Road, Dublin 3, D03 DE48 (dormer dwelling, 274.5 m2 GFA) plus ancillary outbuildings (47 m2 GFA overall). 2. The construction of a residential development (9,953.66 m2 GFA) consisting of 86 no. apartment units (3 no. studios, 35 no. 1 – bed units, 41 no. 2 – bed units, and 7 no. 3 – bed units) ranging between 4 to 7 storeys in height over basement level. 3. Provision of resident’s communal area (38 m2 GFA) at ground floor level. 4. Provision of 1 no. Crèche Facility at ground floor level (75 m2 GFA) with capacity for 20 no. children and associated, secure, open play area (120.8 m2). 5. Provision of 1 no. Café Unit (50 m2 GFA) at ground floor level with associated outdoor seating area. 6. Removal of 2 no. existing vehicular site entrances off Howth Road (R105) and provision of new site access off Howth Road (R105) to serve the development with vehicular, cycling and pedestrian access. 7. The construction of a basement to be accessed off Howth Road (R105) with provision for 46 no. car parking spaces, including accessible and electric vehicle spaces, 2 no. motorcycle parking spaces and 142 no. ‘long stay’ residential secured bicycle parking spaces. 8. 4 no. surface level car parking spaces (consisting of 2 no. employment parking spaces in connection with the crèche and café and 2 no. additional parking spaces as shared GoCar/ Visitor parking spaces), 1 no. set down area and 1 no. parking space for delivery/ services vehicles. 9. Provision of 142 no. ‘long stay’ residential secured bicycle parking spaces at basement level together with additional 50 no. visitor bicycle parking spaces in secure locations at surface level throughout the site. 10. All apartments are provided with private terraces / balconies. 11. The scheme provides a total of 3,059.51 m2 of open space, consisting of 2,075.55 m2 of Communal Open Space (44% of overall site area), 467.86 m2 of Public Open Space for community use (10% of overall site area), and 516.1 m2 of communal roof terrace gardens at 4th, 5th and 6th floor level for residents (11% of overall site area). 12. Total non-residential use is 163 m2 (1.6 % of overall development). 13. Provision of 63.6 m2 of Bin Storage, 30 m2 of Storage, 34.2 m2 of CHP Room and 40 m2 of Communications Room (all at basement level). 14. The development will also provide for all associated ancillary site development infrastructure including: public lighting, new watermain connection and foul and surface water drainage; internal roads & footpaths; site landscaping, including boundary treatments and all associated site development and excavation works above and below ground necessary to facilitate the development

WEB1740/25 is a planning application to Dublin City Council for the development will consist of: 1. The demolition of 2 no. existing, detached, received on 5 Apr 2025; it was withdrawn on 11 Apr 2025.

Planning details

Reference
WEB1740/25
Local authority
Dublin City Council
Status
Withdrawn or invalid · register status “Decision Notice Issued
Received
5 Apr 2025
Observations close
12 May 2025 (closed 494 days ago)
Decision due
30 May 2025 · decided 11 Apr 2025
Decision
Application declared inva on 11 Apr 2025
Proposed development
The development will consist of: 1. The demolition of 2 no. existing, detached residential dwellings on the subject site, 110, Howth Road, Dublin 3, D03 KV60 (single storey dwelling, 168.7 m2 GFA) and 114, Howth Road, Dublin 3, D03 DE48 (dormer dwelling, 274.5 m2 GFA) plus ancillary outbuildings (47 m2 GFA overall). 2. The construction of a residential development (9,953.66 m2 GFA) consisting of 86 no. apartment units (3 no. studios, 35 no. 1 – bed units, 41 no. 2 – bed units, and 7 no. 3 – bed units) ranging between 4 to 7 storeys in height over basement level. 3. Provision of resident’s communal area (38 m2 GFA) at ground floor level. 4. Provision of 1 no. Crèche Facility at ground floor level (75 m2 GFA) with capacity for 20 no. children and associated, secure, open play area (120.8 m2). 5. Provision of 1 no. Café Unit (50 m2 GFA) at ground floor level with associated outdoor seating area. 6. Removal of 2 no. existing vehicular site entrances off Howth Road (R105) and provision of new site access off Howth Road (R105) to serve the development with vehicular, cycling and pedestrian access. 7. The construction of a basement to be accessed off Howth Road (R105) with provision for 46 no. car parking spaces, including accessible and electric vehicle spaces, 2 no. motorcycle parking spaces and 142 no. ‘long stay’ residential secured bicycle parking spaces. 8. 4 no. surface level car parking spaces (consisting of 2 no. employment parking spaces in connection with the crèche and café and 2 no. additional parking spaces as shared GoCar/ Visitor parking spaces), 1 no. set down area and 1 no. parking space for delivery/ services vehicles. 9. Provision of 142 no. ‘long stay’ residential secured bicycle parking spaces at basement level together with additional 50 no. visitor bicycle parking spaces in secure locations at surface level throughout the site. 10. All apartments are provided with private terraces / balconies. 11. The scheme provides a total of 3,059.51 m2 of open space, consisting of 2,075.55 m2 of Communal Open Space (44% of overall site area), 467.86 m2 of Public Open Space for community use (10% of overall site area), and 516.1 m2 of communal roof terrace gardens at 4th, 5th and 6th floor level for residents (11% of overall site area). 12. Total non-residential use is 163 m2 (1.6 % of overall development). 13. Provision of 63.6 m2 of Bin Storage, 30 m2 of Storage, 34.2 m2 of CHP Room and 40 m2 of Communications Room (all at basement level). 14. The development will also provide for all associated ancillary site development infrastructure including: public lighting, new watermain connection and foul and surface water drainage; internal roads & footpaths; site landscaping, including boundary treatments and all associated site development and excavation works above and below ground necessary to facilitate the development
As published by the register.
Site area
4,661 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name

Around this site this application first, then everything within 500 m

Explore from here
Click a dot to open its row.
Loading planning applications…
Free · during launch · limited time

Full planning report for 53.36775, -6.21513

Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.

No account, no payment. Not a statutory planning search.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    Zone Z1 - DEV PLAN 2022-2028

    R2 — Existing residential

    Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

    An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

    Designations within 250 m

    No OPW flood extent nearby.

    • NIAH-recorded building · 15
      De La Salle Provincialate; house; Hollybrook Park
    • Radon risk area · 3
      About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 87835). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open