110 & 114 Howth Road
86 apartments7 storeysMatriciana LtdDublin 3, Dublin City Council
Approved on appeal Feb 2026.
- 15 Apr 2025Received
- 17 Sept 2025Approved
- 10 Oct 2025Appealed
- 16 Feb 2026Appeal: Approved with conditions
- 16 Feb 2026Final approval
- 16 Feb 2031Approval runs out
- Status
- Appeal decided — granted No start yet
- Decision
- Approved · 17 Sept 2025
- Size
- 86 apartments · up to 7 storeys
- Uses
- residential, apartments, creche, retail
- Applicant
- Matriciana Ltd
- Site
- 4,661 m²
- Appeal
- ACP 500043 · Approved with conditions
Building progress councils’ figures, Q2 2026
65 homes permitted; building has not started (Q2 2026).
completed · under construction · not started · 0 houses and 65 apartments permitted
Quarter by quarter
| Quarter | Permitted | Under construction | Completed | Completed share |
|---|---|---|---|---|
| Q2 2025 | — | 0 | 0 | |
| Q3 2025 | — | 0 | 0 | |
| Q4 2025 | — | — | — | |
| Q1 2026 | 65 | 0 | 0 | |
| Q2 2026 | 65 | 0 | 0 |
The scheme
Matriciana Ltd proposes the demolition of two existing dwellings at 110 and 114 Howth Road in Clontarf to construct a residential development. The scheme consists of 86 apartment units ranging from 4 to 7 storeys in height over a basement level. The development also includes a creche facility and a cafe unit at ground floor level.
it involves the construction of 86 apartment units
What the register says
We, Matriciana Ltd., intend to apply for Planning Permission for development at this site: 110 & 114, Howth Road, Clontarf, Dublin 3. The development will consist of: 1. The demolition of 2 no. existing, detached residential dwellings on the subject site, 110, Howth Road, Dublin 3, D03 KV60 (single storey dwelling, 168.7 m2 GFA) and 114, Howth Road, Dublin 3, D03 DE48 (dormer dwelling, 274.5 m2 GFA) plus ancillary outbuildings (47 m2 GFA overall). 2. The construction of a residential development (9,953.66 m2 GFA) consisting of 86 no. apartment units (3 no. studios, 35 no. 1 - bed units, 41 no. 2 - bed units, and 7 no. 3 - bed units) ranging between 4 to 7 storeys in height over basement level. 3. Provision of resident's communal area (38 m2 GFA) at ground floor level. 4. Provision of 1 no. Crèche Facility at ground floor level (75 m2 GFA) with capacity for 20 no. children and associated, secure, open play area (120.8 m2). 5. Provision of 1 no. Café Unit (50 m2 GFA) at ground floor level with associated outdoor seating area. 6. Removal of 2 no. existing vehicular site entrances off Howth Road (R105) and provision of new site access off Howth Road (R105) to serve the development with vehicular, cycling and pedestrian access. 7. The construction of a basement to be accessed off Howth Road (R105) with provision for 46 no. car parking spaces, including accessible and electric vehicle spaces, 2 no. motorcycle parking spaces and 142 no. 'long stay' residential secured bicycle parking spaces. 8. 4 no. surface level car parking spaces (consisting of 2 no. employment parking spaces in connection with the crèche and café and 2 no. additional parking spaces as shared GoCar/ Visitor parking spaces), 1 no. set down area and 1 no. parking space for delivery/ services vehicles. 9. Provision of 142 no. 'long stay' residential secured bicycle parking spaces at basement level together with additional 50 no. visitor bicycle parking spaces in secure locations at surface level throughout the site. 10. All apartments are provided with private terraces / balconies. 11. The scheme provides a total of 3,059.51 m2 of open space, consisting of 2,075.55 m2 of Communal Open Space (44% of overall site area), 467.86 m2 of Public Open Space for community use (10% of overall site area), and 516.1 m2 of communal roof terrace gardens at 4th, 5th and 6th floor level for residents (11% of overall site area). 12. Total non-residential use is 163 m2 (1.6 % of overall development). 13. Provision of 63.6 m2 of Bin Storage, 30 m2 of Storage, 34.2 m2 of CHP Room and 40 m2 of Communications Room (all at basement level). 14. The development will also provide for all associated ancillary site development infrastructure including: public lighting, new watermain connection and foul and surface water drainage; internal roads & footpaths; site landscaping, including boundary treatments and all associated site development and excavation works above and below ground necessary to facilitate the development. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of Dublin City Council, Planning Department, Block 4, Ground Floor, Civic Offices, Wood Quay, Dublin 8 during its public opening hours (9.00a.m.- 4.30p.m.). A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee (€20.00) within the period of 5 weeks beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission
Summary from the register record.
Planning timeline 6 steps
- 15 Apr 2025Application lodged — Standard
- 17 Sept 2025Council decision — Grant
- 10 Oct 2025Appealed to An Coimisiún Pleanála — PL-500043-DN
- 16 Feb 2026Commission decision — Granted
- 16 Feb 2026Final approval
- 1 Apr 2031Approval runs out (estimate)
The site 4,661 m²
Boundary of 110 & 114 Howth Road as the Dublin councils map it in the housing pipeline.
Planning applications inside the site 3 applications in the last 10 years
Appeals inside the site 1 with An Coimisiún Pleanála
Other big developments nearby within 2 km
- Former Carmelite Convent of the Incarnation · 99 homes · 6 storeys · 2.0 km away
Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.