Refused in Oct 2023.
- 17 Aug 2023Received
- 5 Oct 2023Refused
- 4 Oct 2024Approval runs out
- Status
- Refused
- Decision
- Refused · 5 Oct 2023
- Council
- Donegal County Council
- Type
- EXTENSION OF DURATION
- Site
- 9.70 ha
What’s proposed
CONSTRUCTION OF TWO WIND TURBINES COMPRISING A STEEL TOWER, NACELLES AND COMPOSITE FIBRE ROTOR BLADES WITH A HUB HEIGHT OF UP TO 85 METRES, A ROTOR BLADE DIAMETER OF UP TO 82 METRES, AND THUS A BLADE TIP HEIGHT OF UP TO 126 METRES. THE PROPOSED DEVELOPMENT ALSO INCLUDES EXTERNAL WIND TURBINE TRANSFORMERS; TURBINE HARDSTANDS; NEW ACCESS TRACKS, UPGRADE OF EXISTING TRACKS, NEW SITE ENTRANCE; DRAINAGE WORKS INCLUDING DRAINAGE CHANNELS AND SILT TRAPS ALONG THE ACCESS TRACKS; UNDERGROUND ELECTRICAL CABLES; AND ALL ANCILLARY DEVELOPMENT AND ASSOCIATED SITE WORKS
Planning details
- Reference
- 2351218
- Local authority
- Donegal County Council
- Status
- Refused · register status “APPLICATION FINALISED”
- Received
- 17 Aug 2023
- Observations close
- 21 Sept 2023 (closed 1118 days ago)
- Decision due
- 11 Oct 2023 · decided 5 Oct 2023
- Decision
- Refused on 5 Oct 2023
- Proposed development
- CONSTRUCTION OF TWO WIND TURBINES COMPRISING A STEEL TOWER, NACELLES AND COMPOSITE FIBRE ROTOR BLADES WITH A HUB HEIGHT OF UP TO 85 METRES, A ROTOR BLADE DIAMETER OF UP TO 82 METRES, AND THUS A BLADE TIP HEIGHT OF UP TO 126 METRES. THE PROPOSED DEVELOPMENT ALSO INCLUDES EXTERNAL WIND TURBINE TRANSFORMERS; TURBINE HARDSTANDS; NEW ACCESS TRACKS, UPGRADE OF EXISTING TRACKS, NEW SITE ENTRANCE; DRAINAGE WORKS INCLUDING DRAINAGE CHANNELS AND SILT TRAPS ALONG THE ACCESS TRACKS; UNDERGROUND ELECTRICAL CABLES; AND ALL ANCILLARY DEVELOPMENT AND ASSOCIATED SITE WORKSAs published by the register.
- Site area
- 9.70 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 2 · 500 m · 5 years
Zoning
Not zoned in the current plan.
Protections nearby 250 m
No mapped flood area nearby.
Nothing else protected nearby.
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
2351218 is a planning application to Donegal County Council for construction of two wind turbines comprising a steel tower, nacelles and composite fibre, received on 17 Aug 2023; permission was refused on 5 Oct 2023.