PlanningRegister.ie
Fingal County Council · F20A/0535

Site at Holywell Distributor Road, Mountgorry, Swords, Co. Dublin

Approved in Jun 2022. Building started in 2025.

What’s proposed

In plain English

A new petrol filling station with electric car charging points

The applicant wants to build a petrol station featuring a forecourt with three fuel pump islands and a canopy. The project also includes installing electric car charging points.

  • Includes underground fuel storage tanks
  • Features an illuminated canopy over the forecourt
  • Includes associated pipework, fill points, and vents
Written by AI from the council’s description

An AI model rewrote the council’s description below in everyday words on 9 Oct 2026. It was told to use only that text, and every number it wrote was checked against it. It says nothing about whether the application will be approved. The council’s wording and planning file are the record.

The council’s description

The development will consist of a Petrol Filling Station to include: (i) A forecourt area with 3 no. fuel pump islands, illuminated forecourt canopy over, underground fuel storage tanks, associated pipework and over-ground fill points and vents, electric car charging points and associated infrastructure.

Show all

(ii) An amenity building of 291 sqm gross floor area comprising a convenience shop (100 sq.m net retail area), restaurant/cafe area with 1 no food offering with hot and cold meals and refreshments for sale for consumption on and off the premises, associated customer seating, customer WCs, Back of House area with food preparation areas, ancillary office, staff welfare facilities, storage and plant areas. (iii) New vehicular entrance and exit, associated traffic signage, internal and external traffic calming measures. (iv) On-site facilities including, air/water services, car and bicycle parking. (v) Illuminated and non-illuminated operator signage including main ID Totem sign, canopy and facade signage. (vi) All associated site drainage, lighting, landscaping, boundary treatments and site development works. AI received…

Cut short by the council feed. Full text ↗

  1. 24 Aug 2021Received
  2. 16 Sept 2021Approved
  3. 11 Oct 2021Appealed
  4. 8 Jun 2022Appeal: Approved with conditions
  5. 8 Jun 2022Final approval
  6. 18 Aug 2025Building started

Planning details

Status
Building startedi
Decision
Approved · 16 Sept 2021
Reference
F20A/0535
Received
24 Aug 2021
Further information
Requested 17 Dec 2020 · received 24 Aug 2021
Site
2,275 m²
Appeal
ACP 311621 · Approved with conditions

12 other applications within 500 m in the last year

Get the full report

Nearby 12 · 500 m · 12 months

Distance
Time
Show all 12

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Appeal

ACP 311621 · Planning Appeal · decided · Approved with conditions 8 Jun 2022
received by the Commission 11 Oct 2021 · inspector's report · board order

Building started

  • 18 Aug 2025 · Builder told the council work was starting CN0132227FL

Zoning

GE - General Employment: Facilitate opportunities for compatible industry and general employment uses, logistics and warehousing activity in a good quality physical environment. General Employment areas should be highly accessible, well designed, permeable and legible.

C2.1 — Economic development and employment

Zoned for employment uses. Housing is not the intended use here.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • EPA-licensed facility · 1
    P1106
Where this comes from

National planning feed (NPAD), fetched 24 Nov 2026, 23:00.

Source: National Planning Application Database · fetched 24 Nov 2026, 23:00
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.024 Nov 2026, 23:00open
Summary

F20A/0535 is a planning application to Fingal County Council for the development will consist of a Petrol Filling Station to include: (i) A forecourt, received on 24 Aug 2021; permission was granted on 16 Sept 2021.