PlanningRegister.ie
Kerry County Council · 2561153

Kerry Technology Park, Dromthacker, Tralee

Approved in May 2026. No sign of building yet.

  1. 10 Dec 2025Received
  2. 9 Apr 2026Conditional
  3. 13 May 2026Final approval
  4. 12 May 2031Approval runs out
Status
Approved
Decision
Conditional · 9 Apr 2026
Council
Kerry County Council
Type
PERMISSION
Site
9,028 m²

What’s proposed

Electricity Supply Board (ESB) intends to apply for permission for development of a 38 kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (1.31ha) at Kerry Technology Park, Dromthacker, Tralee, Co. Kerry. The site is generally bound to the north by the Kerry Technology Park access road (subject to planning permission Ref: 2360295); to the east by the rear of residential properties; to the south by the Knockawaddra Road and the rear of residential and commercial properties along the Knockawaddra Road and to the west by an existing office building and associated car parking area. The proposed development will consist of: • Construction of a substation compound of approximately 2,006m2 gross area enclosed by a 2.6m high stone wall along the northern perimeter of the substation and a 2.6 m high palisade fence around the eastern, southern and western sides of the perimeter of the substation, with the following electrical plant within the substation: • 1 No. prefabricated 38 kV GIS module and foundation (c.31.0m2 and c.5.1 m high); • 1 No. prefabricated MV GIS module and foundation (c.34.0 and c.4.6m high); • 1 No. prefabricated Control Room module and foundation (c.34.0m2 and c.4.6 m high); • 2 No. 38/20 kV 10 MVA transformers and associated bunds (c.45.85m2, c.4.7 m high ea.); • 1 No. House Transformer (c. 7.4 m2 and c. 1.3 m high); and • All associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables. • Internal access road within the proposed substation compound. • Site access road and footpath from the existing internal technology park road and footpath. • All associated site development works above and below ground including provision of lighting, boundary fences, landscaping, site services including drainage and all other works

Planning details

Reference
2561153
Local authority
Kerry County Council
Status
Granted with conditions · register status “APPLICATION FINALISED”
Received
10 Dec 2025
Observations close
23 Jan 2026 (closed 286 days ago)
Decision due
12 Apr 2026 · decided 9 Apr 2026
Decision
Conditional on 9 Apr 2026
Site area
9,028 m² from the mapped boundary, not the council's figure

Live near Kerry Technology Park?

Everything else planned on your street, in one report.

Check my street
Council register ↗

One email to confirm. Unsubscribe in one click.

Nearby 5 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Zoning

C7 — Rural business

Zoned for rural-related business with a demonstrated need for a rural location.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

  • Recorded monument · 4
    Enclosure; Burnt mound

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2561153 is a planning application to Kerry County Council for electricity Supply Board (ESB) intends to apply for permission for development of a 38, received on 10 Dec 2025; permission was granted with conditions on 9 Apr 2026.