Kerry Technology Park , Dromthacker , Tralee
- 10 Dec 2025Received
- 9 Apr 2026Conditional
- 13 May 2026Final grant
- 12 May 2031Permission expires
- Status
- Granted with conditions
- Decision
- Conditional · 9 Apr 2026
- Council
- Kerry County Council
- Type
- PERMISSION
- Site
- 9,028 m²
What’s proposed
Electricity Supply Board (ESB) intends to apply for permission for development of a 38 kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (1.31ha) at Kerry Technology Park, Dromthacker, Tralee, Co. Kerry. The site is generally bound to the north by the Kerry Technology Park access road (subject to planning permission Ref: 2360295); to the east by the rear of residential properties; to the south by the Knockawaddra Road and the rear of residential and commercial properties along the Knockawaddra Road and to the west by an existing office building and associated car parking area. The proposed development will consist of: • Construction of a substation compound of approximately 2,006m2 gross area enclosed by a 2.6m high stone wall along the northern perimeter of the substation and a 2.6 m high palisade fence around the eastern, southern and western sides of the perimeter of the substation, with the following electrical plant within the substation: • 1 No. prefabricated 38 kV GIS module and foundation (c.31.0m2 and c.5.1 m high); • 1 No. prefabricated MV GIS module and foundation (c.34.0 and c.4.6m high); • 1 No. prefabricated Control Room module and foundation (c.34.0m2 and c.4.6 m high); • 2 No. 38/20 kV 10 MVA transformers and associated bunds (c.45.85m2, c.4.7 m high ea.); • 1 No. House Transformer (c. 7.4 m2 and c. 1.3 m high); and • All associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables. • Internal access road within the proposed substation compound. • Site access road and footpath from the existing internal technology park road and footpath. • All associated site development works above and below ground including provision of lighting, boundary fences, landscaping, site services including drainage and all other works
2561153 is a planning application to Kerry County Council for electricity Supply Board (ESB) intends to apply for permission for development of a 38, received on 10 Dec 2025; permission was granted with conditions on 9 Apr 2026.
Planning details
- Reference
- 2561153
- Local authority
- Kerry County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 10 Dec 2025
- Observations close
- 23 Jan 2026 (closed 239 days ago)
- Decision due
- 12 Apr 2026 · decided 9 Apr 2026
- Decision
- Conditional on 9 Apr 2026
- Proposed development
- Electricity Supply Board (ESB) intends to apply for permission for development of a 38 kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (1.31ha) at Kerry Technology Park, Dromthacker, Tralee, Co. Kerry. The site is generally bound to the north by the Kerry Technology Park access road (subject to planning permission Ref: 2360295); to the east by the rear of residential properties; to the south by the Knockawaddra Road and the rear of residential and commercial properties along the Knockawaddra Road and to the west by an existing office building and associated car parking area. The proposed development will consist of: • Construction of a substation compound of approximately 2,006m2 gross area enclosed by a 2.6m high stone wall along the northern perimeter of the substation and a 2.6 m high palisade fence around the eastern, southern and western sides of the perimeter of the substation, with the following electrical plant within the substation: • 1 No. prefabricated 38 kV GIS module and foundation (c.31.0m2 and c.5.1 m high); • 1 No. prefabricated MV GIS module and foundation (c.34.0 and c.4.6m high); • 1 No. prefabricated Control Room module and foundation (c.34.0m2 and c.4.6 m high); • 2 No. 38/20 kV 10 MVA transformers and associated bunds (c.45.85m2, c.4.7 m high ea.); • 1 No. House Transformer (c. 7.4 m2 and c. 1.3 m high); and • All associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables. • Internal access road within the proposed substation compound. • Site access road and footpath from the existing internal technology park road and footpath. • All associated site development works above and below ground including provision of lighting, boundary fences, landscaping, site services including drainage and all other worksAs published by the register.
- Site area
- 9,028 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 10 applications within 500 m in the last 5 years
- OpenDromthacker and Knockawaddra West , Tralee , Co. Kerry
- Open2 Dromtacker , Tralee , Co. Kerry
- GrantedDromthacker and Knockawaddra West , Tralee , Co. Kerry
- GrantedMTU North Campus , Dromtacker , Tralee
- GrantedKerry Technology Park , Dromthacker , Tralee
- GrantedKerry Technology Park Dromthacker & Knockawaddra West , Tralee , Co. Kerry
- GrantedDromthacker and Knockawaddra West , Tralee , Co. Kerry
- CommencedKerry Technology Park , Dromthacker , Tralee
Show all 10
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 380490). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KerryCC/AppFileRefDetails/2561153/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |