Newtown Townland, Celbridge, Co. Kildare
Decided on appeal: granted.
- 10 Dec 2018Received
- 14 Oct 2019Refused
- 29 Dec 2025Approval runs out
- Status
- Appeal decided — granted
- Decision
- Refused · 14 Oct 2019
- Council
- Kildare County Council
- Type
- PERMISSION
- Units
- 58
- Site
- 1.76 ha
What’s proposed
the construction of 58 No. residential dwellings comprised of 4 No. 4 bed detached houses (Type A and A1); 14 No. 3 bed semi-detached houses (Type B); 10 No. 3 bed terraced houses (Type C and C1); 4 No. 2 bed terraced houses (Type D); 2 No. 1 bed bungalow type houses (Type E); along with 12 No. 3 bed duplex townhouses with 12 No. 2 bed apartments contained in 2 No. duplex/apartment blocks (Type F and F1); together with the creation of a vehicular access and pedestrian entrance off the L1016 (Newtown/Ardclough Road); all ancillary internal access roads, public open space, parking, infrastructure, landscaping, boundary treatments and all associated site and development works. The proposed development also includes the provision of a pedestrian footpath along the L1016 (Newtown/Ardclough Road) for the full frontage of the proposed development, at a site of approximately 1.7ha, Revised by Significant Further Information consisting of; (a) The reduction in the number of units proposed from 58 to 55 through the replacement of a duplex/apartment block (6 no. 3 bed duplex townhouses and 6 no. 2 bed apartments – Type F) with 5 no. 3 bed terraced houses (Type C), 1 no. 3 bed semi-detached house and 3 no. 2 bed apartments (Type G); (b) An increase in the site area of 0.2ha (total 1.9ha) to facilitate works along the L1016 (Newtown/Ardclough Road). These works include the provision of a pedestrian footpath (c.275m in length) and associated lighting along the western side of the L1016 (Newtown/Ardclough Road), from the site towards the Chelmsford Estate; together with the provision of a pedestrian crossing, speed calming measures and signage proximate to the site entrance; (c) Revisions to the site layout to include increases in the depth of rear gardens along the northern boundary of the site; minor amendments to the location, layout and design of Unit Nos. 1, 39-42, 43 and 44, ancillary revisions to the boundary treatments, landscaping works; internal access roads; parking; drainage infrastructure and all associated site and development works
Planning details
- Reference
- 181481
- Local authority
- Kildare County Council
- Status
- Appeal decided — granted · register status “APPLICATION FINALISED”
- Received
- 10 Dec 2018
- Observations close
- 23 Jan 2019 (closed 2821 days ago)
- Decision due
- 14 Oct 2019 · decided 14 Oct 2019
- Decision
- Refused on 14 Oct 2019
- Site area
- 1.76 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 5 · 500 m · 5 years
Homes nearby
- For saleTigeen Caerleon, Ardclough Road, Celbridge, W23 A3HC
- For sale16 River View, Abbeyfarm, Celbridge, Co. Kildare, W23 RW90
- For saleWoodview, Dangan, Celbridge, Co. Kildare, W23 Y16A
- For sale99 The Drive, Hazelhatch Park, Celbridge, Co. Kildare, W23 PY97
- For sale67 Callenders Mill, Celbridge, Co. Kildare, W23 KV67
- For sale67 Callenders Mill, Celbridge, Co. Kildare, W23 KV67
Appeal
Appeal 305886-19 (status unknown), not yet matched.
Zoning
Not zoned in the current plan.
Protections nearby 250 m
Flood area nearby (OPW maps). floodinfo.ie ↗
Nothing else protected nearby.
Where this comes from
National planning feed (NPAD), fetched 7 Oct 2026, 01:19.
Source: npad · fetched 7 Oct 2026, 01:19
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 7 Oct 2026, 01:19 | open |
Summary
181481 is a planning application to Kildare County Council for the construction of 58 No. residential dwellings comprised of 4 No. 4 bed detached, received on 10 Dec 2018; permission was refused on 14 Oct 2019.