Tipper Road, Naas, Co. Kildare
Approved in Jun 2021.
- 12 Apr 2021Received
- 1 Jun 2021Conditional
- 8 Aug 2026Approval runs out
- Status
- Approved
- Decision
- Conditional · 1 Jun 2021
- Council
- Kildare County Council
- Type
- EXTENSION OF DURATION
- Site
- 77.49 ha
What’s proposed
Extension of Duration of Planning Ref. No. 16/217 - sought for demolition of: (1) The existing small stand; (2) The binocular hire kiosk; (3) The part-demolition of the self-service restaurant, and for (4) The removal of the existing steel roof over the north stand. Permission is also sought for new works which comprise the construction of: (5) A new 624sqm two storey pavilion bar and restaurant with a 532sqm raised viewing terrace; (6) The change of use and renovation of the remaining 327sqm of the self-service restaurant for use as offices and drop-in childcare centre; (7) The erection of a new light-weight roof structure over the north stand; (8) The installation of 450sqm of solar panels on the stable roofs; (9) The construction of a new set-down area for the childcare centre; (10) The installation of an emergency back-up generator; (11) General landscape improvement works, and (12) All necessary site works associated with the above proposals
Planning details
- Reference
- 21481
- Local authority
- Kildare County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 12 Apr 2021
- Decision due
- 6 Jun 2021 · decided 1 Jun 2021
- Decision
- Conditional on 1 Jun 2021
- Site area
- 77.49 ha from the mapped boundary, not the council's figure
Nearby 7 · 500 m · 12 months
- AppealedSite at lands west of Naas Racecourse south of Dublin Road , north of Tipper Road and generally bounded by existing residential developments to the north south and west at Kings Court Kingsfurze Avenue The Woodlands and The Gallops , Kingsfurze
- Granted32 The Gallops , Kingsfurze , Naas
- Withdrawn32 The Gallops , Kingsfurze , Naas
- CommencedPenuel Cottage St. Jude's , Tipper Road , Naas
- WithdrawnPenuel Cottage St. Jude's , Tipper Road , Naas
- WithdrawnPenuel Cottage St. Jude's , Tipper Road Naas , Co. Kildare
- WithdrawnPenuel Cottage St. Jude's , Tipper Road Naas , Co. Kildare
Homes nearby
- For sale27 Kings Court, Naas, Co. Kildare, W91 X2EP
- For saleTipperstown Walk, Tipper Road, Naas, Co. Kildare
- For saleLissadell, Dublin Road, Naas, Co. Kildare, W91 R2FF
- For sale2 The Court, Racecourse Gate, Naas, Co. Kildare, W91 HF6R
- For sale10 Beasley House, Punchestown Gate, Naas, Co. Kildare, W91 E924
- For saleApt 5 Beasley House, Punchestown Gate, Naas, Co. Kildare, W91 KX05
Zoning
Zoned for employment uses. Housing is not the intended use here.
Land zoned for business use. Expect offices, warehousing, industry or retail rather than housing; a residential application here is swimming against the plan.
Open space and recreational amenity, to be preserved as such.
Zoned to protect agriculture, rural enterprise and biodiversity. New houses are restricted to demonstrated local need.
Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
Protections nearby 250 m
- NIAH-recorded building · 5
- Recorded monument · 3
Where this comes from
National planning feed (NPAD), fetched 11 Sept 2026, 18:51.
Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 11 Sept 2026, 18:51 | open |
Summary
21481 is a planning application to Kildare County Council for extension of Duration of Planning Ref. No. 16/217 - sought for demolition of: (1) The, received on 12 Apr 2021; permission was granted with conditions on 1 Jun 2021.