Dunnstown, Brannockstown, Naas
Approved in Jan 2023. No sign of building yet.
Start notices are matched from the national building control register; a start on site can be missed.
- 19 Aug 2022Received
- 17 Nov 2022Conditional
- 25 Jan 2023Final approval
- 24 Jan 2033Approval runs out
Planning details
- Status
- Approved
- Decision
- Conditional · 17 Nov 2022
- Reference
- 221016
- Received
- 19 Aug 2022
- Further information
- Requested 11 Oct 2022 · received 24 Oct 2022
- Site
- 1.52 ha
What’s proposed
10 year planning permission to develop a synchronous condenser grid support facility, which will connect to the adjoining ESB Dunnstown Electricity Substation in the townland of Dunnstown, Brannockstown, Naas, Co. Kildare. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life.
Show all
The development is to be located within a site compound c.1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c. 540 sqm. c.12m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside the footprint of the building but within a fenced compound will include cooling equipment (c. 160sqm., c.3m high); 6 No. modular containers to house electrical and control equipment (total area of c.195 sqm., c.5m high): a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant. 1 No. firefighting water tank, above ground oil separator and collection pit, c. 100m of underground cabling ducts and cable to the adjoining ESB substation, balustrade boundary fencing, security entrance gate and CCTV, all other ancillary and miscellaneous site works to include site clearance, site access, internal roads and development of areas of hard standing any lay-down area. The proposed development will connect by underground cable to the Electricity Supply Board (ESB) 220kV substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in Section 2(1) of the Electricity Regulation Act…
Cut short by the council feed. Full text ↗
2 other applications within 500 m in the last year
Get the full reportNearby 2 · 500 m · 12 months
Homes nearby
- For saleMylerstown, Two Mile House, Co. Kildare
- WithdrawnHazel Cottage, Mylerstown, Two Mile House, Co. Kildare, W91 DF91
- WithdrawnThe Old School House, Carnalway, Kilcullen, Co. Kildare, R56 DX44
- WithdrawnMountain View, Harristown, Brannockstown, Naas, Co. Kildare, W91 C3X6
- Withdrawn13 Dowdingstown Wood, Naas, Two Mile House, Co. Kildare, W91 V67W
Protections nearby 250 m
- Recorded monument · 13
Where this comes from
National planning feed (NPAD), fetched 11 Sept 2026, 18:51.
Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 11 Sept 2026, 18:51 | open |
Summary
221016 is a planning application to Kildare County Council for 10 year planning permission to develop a synchronous condenser grid support facility, received on 19 Aug 2022; permission was granted with conditions on 17 Nov 2022.