Coolcarrigan, Timahoe West, Co. Kildare
Approved in Jul 2023. No sign of building yet.
- 7 Oct 2022Received
- 12 May 2023Conditional
- 10 Jul 2023Final approval
- 9 Jul 2033Approval runs out
- Status
- Approved
- Decision
- Conditional · 12 May 2023
- Council
- Kildare County Council
- Type
- PERMISSION
- Site
- 114.91 ha
What’s proposed
for a 10-year permission, for the construction and operation of a renewable energy development within a site boundary of c. 114 ha. The proposed development will consist of a development area of circa 71.7 ha including solar on fixed on ground mounted frames with a maximum height of 3 metres, 1 No. battery storage compound, 1 No. customer switchgear container, 1 No. 110kv grid connected single storey substation, 1 No. single storey customer substation and all associated electrical plant, inverter units, electrical transformers, battery units, cooling equipment, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, upgrading of existing access road and new internal access roads and all associated ancillary activities. The proposed development will have a 35-year operational life from the date of commissioning. Revised by significant further information which consists of Provision of quantum of energy export (of up to 80MW) in the proposed development and storage capacity of proposed battery compound (of up to 80MWh). Clarification of energy export (of up to 15MW, no battery storage) of adjacent permitted development 15/1172 (extension of duration under 20/1052); Submission of details of adjacent permitted development 15/1172 (extension of duration under 20/1052); Provision of details of minor works to site entrance, construction traffic warning signage to public roadway, at proposed site entrance and also within internal haul routes; Clarification of extent of private roadway (haul roads) within the site; Provision of a fire risk assessment of hazards for on or near the solar array and battery storage compound; Provision of programme/schedule of works for proposed development and adjacent permitted development 15/1172 (extension of duration under 20/1052; Provision of amended Archaeological Impact Assessment. Provision of draft Construction Traffic Management Plan; Provision of Independent Road Safety Audit Stage 1/2; Provision of amended preliminary Construction and Environment Management Plan; Provision of Preliminary Public Liaison Engagement Plan
Planning details
- Reference
- 221203
- Local authority
- Kildare County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 7 Oct 2022
- Decision due
- 14 May 2023 · decided 12 May 2023
- Decision
- Conditional on 12 May 2023
- Site area
- 114.91 ha from the mapped boundary, not the council's figure
Nearby 3 · 500 m · 5 years
Homes nearby
Protections nearby 250 m
- Recorded monument · 4
Where this comes from
National planning feed (NPAD), fetched 14 Oct 2026, 01:45.
Source: National Planning Application Database · fetched 14 Oct 2026, 01:45
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 14 Oct 2026, 01:45 | open |
Summary
221203 is a planning application to Kildare County Council for for a 10-year permission, for the construction and operation of a renewable energy, received on 7 Oct 2022; permission was granted with conditions on 12 May 2023.