PlanningRegister.ie
Kildare County Council · 221504

Great Connell and Kilbelin, Newbridge, Co. Kildare

Approved in Nov 2023. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

What’s proposed

The development will consist of the provision of approximately 790m of new Distributor Road, including a new bridge over the River Liffey, forming part of the Newbridge South Outer Orbital Road (NSOOR) linking the Great Connell Road to the section of the NSOOR permitted under ABP Reg.

Show all

Ref. 302141-18 (Belin Woods, currently under construction) and will comprise of the following works: Provision of a single carriageway road, with cycleways and footpaths in both directions, including a five-span bridge of approximately 170m over the River Liffey, with provision for future bus stops and associated toucan pedestrian crossing; Tie-in of the proposed section of Distributor Road with the Great Connell Road including upgrade of the existing roundabout to a signal control junction including toucan crossings on all arms of the junction; Provision of a proposed River Park of approximately 9.2 ha as a multi-use recreational amenity, including pedestrian and cycle routes connecting to existing public space network, a multi-use games area (MUGA) and incorporating biodiversity and water management features; Provision of 2 No. new agricultural entrances from the proposed Distributor Road to adjoining lands (pending any future residential development of those lands); and All associated earthworks, signage, lighting, drainage works, services and connections, landscaping works, environmental measures and all ancillary works above and below ground level. The application will be accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS)

  1. 19 Dec 2022Received
  2. 8 Sept 2023Conditional
  3. 2 Nov 2023Final approval
  4. 1 Nov 2028Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Conditional · 8 Sept 2023
Reference
221504
Received
19 Dec 2022
Further information
Requested 21 Feb 2023 · received 17 Jul 2023
Site
14.33 ha

5 other applications within 500 m in five years

Get the full report

Nearby 5 · 500 m · 5 years

Distance
Time

Explore this area on the map →

Homes nearby

Zoning

C6 — Waterfront

Zoned for waterfront and harbour-related development.

G4 — Open space

Open space and recreational amenity, to be preserved as such.

O1 — Green belt and strategic open land

Land zoned to keep urban areas apart. Development is strongly resisted.

R1 — New residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

  • Recorded monument · 1
    R186149
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

221504 is a planning application to Kildare County Council for the development will consist of the provision of approximately 790m of new Distributor, received on 19 Dec 2022; permission was granted with conditions on 8 Sept 2023.