Morristownbiller, Newbridge, Co. Kildare
Approved in Jan 2023. Building started.
- 20 May 2022Received
- 26 Jan 2023Refused
- 26 Apr 2024Final approval
- 27 Oct 2025Building started
- 25 Apr 2029Approval runs out
Planning details
- Status
- Building started
- Decision
- Refused · 26 Jan 2023
- Reference
- 22599
- Received
- 20 May 2022
- Further information
- Requested 11 Jul 2022 · received 22 Dec 2022
- Units
- 58
- Site
- 1.83 ha
What’s proposed
The construction of 60 Residential Units as follows; 12 no. Type A (3 bed semi-detached units); 19 no. Type B (2 bed terrace units); 21 no. Type A1 (3 bed end of Terrace units); 2 no. Type C (3 bed semi-detached units); 2 no Type D (1 bed apartment); 2 no Type E (1 bed apartment); 1 no Type F, (2 bed apartment) and 1 no Type G, (2 bed apartment).
Show all
Provision of public and private open space, carparking, bin storage, public lighting, landscaping, boundary treatments, pedestrian access and site entrance onto Lakeside Park, connections to existing services and all associated development. Revised by Significant Further Information which consists of a revised site layout, reduction of 2 no. units from 60 to 58 and related amendments to design
4 other applications within 500 m in the last year · 1 open for comments
Open the reportNearby 4 · 500 m · 12 months
- OpenNumber 6 , Moorefield Drive , Newbridge
- GrantedMorristownbiller , Newbridge , Co Kildare
- GrantedMorristown Road , Newbridge , County Kildare
- Granted1694 Páirc Mhuire , Newbridge , Kildare
- Refused1694 Páirc Mhuire , Newbridge , Kildare
- Commenced1732 Pairc Mhuire , Newbridge , Co. Kildare
- GrantedDara Park , Newbridge , Co. Kildare
- Granted15 Standhouse Lawns , Newbridge , Co. Kildare
- Withdrawn15 Standhouse Lawns , Newbridge , Co. Kildare
- Withdrawn15 Standhouse Lawns , Newbridge , Co. Kildare
- Commenced32 Acorn Downs , Newbridge , Co Kildare
- Withdrawn32 Acorn Downs , Newbridge , Co. Kildare
- Withdrawn67a Morristown Estate , Newbridge , Co. Kildare
- GrantedNewbridge Veterinary Clinic , Morristown , Newbridge
- GrantedNewbridge Family Resource Centre , Dara Park , Newbridge
- CommencedDara Park , Moorefield Td. , Newbridge
- Commenced879 Piercetown , Newbridge , Co. Kildare W12 XF86.
Homes nearby
- For sale2580 Dara Park, Newbridge, Co. Kildare, W12 VH22
- For sale2110 Highfield Estate, Newbridge, Co. Kildare, W12 P862
- For sale3312 Lakeside Park, Newbridge, Co. Kildare, W12 NH72
- For sale2694 Dara Park, Newbridge, Co. Kildare, W12 V972
- For sale1653 Pairc Mhuire, Newbridge, Co. Kildare, W12 W403
- For sale1636 Pairc Mhuire, Newbridge, Co. Kildare, W12 YC98
Appeal
Appeal ABP-315884-23 (status unknown), not yet matched.
Building started
- 15 May 2026 · Builder told the council work was starting (seven-day notice) SN0014168KE
- 30 Mar 2026 · Builder told the council work was starting CN0140597KE
- 27 Oct 2025 · Builder told the council work was starting CN0135594KE
Zoning
Open space and recreational amenity, to be preserved as such.
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
Reserved for the schools, creches, community and health facilities a neighbourhood needs.
Where this comes from
National planning feed (NPAD), fetched 11 Nov 2026, 23:00.
Source: National Planning Application Database · fetched 11 Nov 2026, 23:00
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 11 Nov 2026, 23:00 | open |
Summary
22599 is a planning application to Kildare County Council for the construction of 60 Residential Units as follows; 12 no. Type A (3 bed semi-detached, received on 20 May 2022; permission was refused on 26 Jan 2023.