Santa Clara, Bishopscourt Lower, Straffan
Approved in Mar 2024. Building started in 2024.
- 28 Nov 2023Received
- 24 Jan 2024Conditional
- 6 Mar 2024Final approval
- 6 Aug 2024Building started
Planning details
- Status
- Building startedi
- Decision
- Conditional · 24 Jan 2024
- Reference
- 231001
- Received
- 28 Nov 2023
- Site
- 4.65 ha
What’s proposed
For alterations to the front elevation consisting of the demolition of the front section of the existing dining area and roof over, removal of dormer windows to upper floor bedroom, provision of a new bay window to the front on both floors, alterations to the rear playroom and pantry, internal alterations to the layout, with minor internal and external elevational alterations, all to the existing detached two storey dwelling
2 other applications within 500 m in the last year
Get the full reportNearby 2 · 500 m · 12 months
Homes nearby
Building started
- 6 Aug 2024 · Builder told the council work was starting (opted out of the finish sign-off) CN0117995KE
Where this comes from
National planning feed (NPAD), fetched 11 Sept 2026, 18:51.
Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 11 Sept 2026, 18:51 | open |
Summary
231001 is a planning application to Kildare County Council for for alterations to the front elevation consisting of the demolition of the front section, received on 28 Nov 2023; permission was granted with conditions on 24 Jan 2024.