Porterstown , Kilteel Lower , Kill
- 20 Mar 2023Received
- 11 May 2023Conditional
- 10 Jul 2023Final grant
- 9 Jul 2028Permission expires
- Status
- Granted with conditions
- Decision
- Conditional · 11 May 2023
- Council
- Kildare County Council
- Type
- PERMISSION
- Site
- 2.28 ha
What’s proposed
for a second phase of the existing grid system services facility within the existing grid system services facility within the existing site area of c1.95 hectares, which was granted via reference number 18/247. The second phase will utilise all existing infrastructure, including the EirGrid gird connection infrastructure, site roads, 110kV substation, compounds, and all ancillary services. The proposed new works will consist of the installation and operation of battery energy units, including 1 no. customer switchgear container which will be connected to the national grid, via the existing infrastructure ,electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure on land at
23276 is a planning application to Kildare County Council for for a second phase of the existing grid system services facility within the existing, received on 20 Mar 2023; permission was granted with conditions on 11 May 2023.
Planning details
- Reference
- 23276
- Local authority
- Kildare County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 20 Mar 2023
- Observations close
- 24 Apr 2023 (closed 1240 days ago)
- Decision due
- 14 May 2023 · decided 11 May 2023
- Decision
- Conditional on 11 May 2023
- Proposed development
- for a second phase of the existing grid system services facility within the existing grid system services facility within the existing site area of c1.95 hectares, which was granted via reference number 18/247. The second phase will utilise all existing infrastructure, including the EirGrid gird connection infrastructure, site roads, 110kV substation, compounds, and all ancillary services. The proposed new works will consist of the installation and operation of battery energy units, including 1 no. customer switchgear container which will be connected to the national grid, via the existing infrastructure ,electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure on land atAs published by the register.
- Site area
- 2.28 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 53.24600, -6.54154
Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- EPA-licensed facility · 2
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 132715). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/23276/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |