Porterstown, Kilteel Lower, Kill
Approved in Jul 2023. No sign of building yet.
Start notices are matched from the national building control register; a start on site can be missed.
- 20 Mar 2023Received
- 11 May 2023Conditional
- 10 Jul 2023Final approval
- 9 Jul 2028Approval runs out
Planning details
- Status
- Approved
- Decision
- Conditional · 11 May 2023
- Reference
- 23276
- Received
- 20 Mar 2023
- Site
- 2.28 ha
What’s proposed
For a second phase of the existing grid system services facility within the existing grid system services facility within the existing site area of c1.95 hectares, which was granted via reference number 18/247. The second phase will utilise all existing infrastructure, including the EirGrid gird connection infrastructure, site roads, 110kV substation, compounds, and all ancillary services.
Show all
The proposed new works will consist of the installation and operation of battery energy units, including 1 no. customer switchgear container which will be connected to the national grid, via the existing infrastructure ,electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure on land at
4 other applications within 500 m in five years
Open the reportNearby 4 · 500 m · 5 years
Homes nearby
- For saleSite @ Blackdown, Kilteel, Co. Kildare
- For saleFox Lodge, Foxcovert Lane, Kilteel, Naas, Co. Kildare, W91 XCX8
- Withdrawnc. 6 Acres, Blackchurch & Tuckmilltown, Kill, Co. Kildare
- Withdrawnc. 21 Acres, Blackchurch & Tuckmilltown, Kill, Co. Kildare
- Withdrawnc. 14.5 Acres, Blackchurch & Tuckmilltown, Kill, Co. Kildare
Protections nearby 250 m
- EPA-licensed facility · 2
Where this comes from
National planning feed (NPAD), fetched 11 Sept 2026, 18:51.
Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 11 Sept 2026, 18:51 | open |
Summary
23276 is a planning application to Kildare County Council for for a second phase of the existing grid system services facility within the existing, received on 20 Mar 2023; permission was granted with conditions on 11 May 2023.