Approved in Jul 2023. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

  1. 20 Mar 2023Received
  2. 11 May 2023Conditional
  3. 10 Jul 2023Final approval
  4. 9 Jul 2028Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Conditional · 11 May 2023
Reference
23276
Received
20 Mar 2023
Site
2.28 ha

What’s proposed

For a second phase of the existing grid system services facility within the existing grid system services facility within the existing site area of c1.95 hectares, which was granted via reference number 18/247. The second phase will utilise all existing infrastructure, including the EirGrid gird connection infrastructure, site roads, 110kV substation, compounds, and all ancillary services.

Show all

The proposed new works will consist of the installation and operation of battery energy units, including 1 no. customer switchgear container which will be connected to the national grid, via the existing infrastructure ,electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure on land at

4 other applications within 500 m in five years

Open the report

Nearby 4 · 500 m · 5 years

Distance
Time

Explore this area on the map →

Homes nearby

Protections nearby 250 m

  • EPA-licensed facility · 2
    Saint-Gobain Building Distribution (ROI) Ltd
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

23276 is a planning application to Kildare County Council for for a second phase of the existing grid system services facility within the existing, received on 20 Mar 2023; permission was granted with conditions on 11 May 2023.