Mayfield Interchange Services Area , Junction 14 M7 Motorway Mayfield , Monasterevin Co. Kildare
- 14 Jul 2023Received
- 4 Sept 2023Conditional
- 19 Oct 2023Final grant
- 18 Oct 2028Permission expires
- Status
- Granted with conditions
- Decision
- Conditional · 4 Sept 2023
- Council
- Kildare County Council
- Type
- PERMISSION
- Site
- 1.15 ha
What’s proposed
1. Installation of 24no. electric vehicle car charging bays, 2no. electric vehicle bus charging bays, and 2no. electric vehicle truck charging bays, each comprising a parking space and electric vehicle charging unit; 2. Installation of 59no. staff car parking spaces and relocation of 17no. truck parking spaces; 3. Installation of 10no. electric vehicle power unit’s c/w 2.0m high palisade fence enclosure; 4. Construction of extension to the existing ESB substation building (24sq.m); 5. Site development works to include the following, installation of 1no. covered bicycle parking area, 1no. covered smoking shelter, construction of 2no. dog walking tracks, acoustic perimeter fencing, site lighting, precast kerbing, surfacing, landscaping, and all associated drainage works
2360035 is a planning application to Kildare County Council for 1. Installation of 24no. electric vehicle car charging bays, 2no. electric vehicle bus, received on 14 Jul 2023; permission was granted with conditions on 4 Sept 2023.
Planning details
- Reference
- 2360035
- Local authority
- Kildare County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 14 Jul 2023
- Observations close
- 18 Aug 2023 (closed 1123 days ago)
- Decision due
- 7 Sept 2023 · decided 4 Sept 2023
- Decision
- Conditional on 4 Sept 2023
- Proposed development
- 1. Installation of 24no. electric vehicle car charging bays, 2no. electric vehicle bus charging bays, and 2no. electric vehicle truck charging bays, each comprising a parking space and electric vehicle charging unit; 2. Installation of 59no. staff car parking spaces and relocation of 17no. truck parking spaces; 3. Installation of 10no. electric vehicle power unit’s c/w 2.0m high palisade fence enclosure; 4. Construction of extension to the existing ESB substation building (24sq.m); 5. Site development works to include the following, installation of 1no. covered bicycle parking area, 1no. covered smoking shelter, construction of 2no. dog walking tracks, acoustic perimeter fencing, site lighting, precast kerbing, surfacing, landscaping, and all associated drainage worksAs published by the register.
- Site area
- 1.15 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 53.14510, -7.01083
Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 133681). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/2360035/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |