Former Magee Barracks Kildare Town, Kildare Town, Co. Kildare.
Approved in 2025. Building started in 2026.
- 24 Oct 2023Received
- 9 Oct 2024Conditional
- 31 Jan 2025Final approval
- 19 Jun 2026Building started
- Status
- Building startedi
- Decision
- Conditional · 9 Oct 2024
- Council
- Kildare County Council
- Type
- PERMISSION
- Site
- 4.87 ha
Live near Former Magee Barracks Kildare Town?
Everything else planned on your street, in one report.
Check my streetWhat’s proposed
for the phased construction of a new 2 storey, 37 classroom post primary school (Curragh Community College) with a total floor area of circa 10,883.8sqm along with ancillary accommodation including an external bin store, electricity substation, external caretakers office, storage shed, heat pump enclosure, car parking, drop off, bicycle parking, grass playing pitch (to be shared with adjoining Kildare Town Educate Together and Gaelscoil Mhic Aodha), external ballcourts, including adjusted/ additional ballcourts in the grounds of Kildare Town Educate Together and Gaelscoil Mhic Aodha, Photovoltaic panels on roof, circa 135m length of access road from Melitta Rd, a service road connection off the existing access road to the south east of the site and all ancillary site development works. Phase 1 will include the construction of c.4,982sqm of (2 storey) school accommodation incorporating photovoltaic panels on roof, 16 classrooms, specialist classrooms, sports changing rooms, fitness suite, temporary staffroom and GP Hall / dining space (to be converted to specialist classrooms in Phase 2), along with ancillary accommodation including an external bin store, electricity substation, external caretaker office, storage shed, bicycle parking and 2 No. ballcourts and heat pumps. Phase 1 also includes a temporary permission for an interim school entrance on the south façade, temporary drop off and car parking area, a temporary school vehicular and pedestrian access off the existing access road to the south east and all associated site development works. Phase 2 will include the completion of c.5901.8 sqm of (2 storey) school accommodation incorporating 21 classrooms, specialist classrooms, a general purpose hall, a PE hall, a special needs unit, library, staff room and all ancillary accommodation. Phase 2 also includes 92 No car parking spaces, additional bicycle parking, an SEN garden, a drop off, a grass pitch area, 3 additional ballcourts plus hard and soft landscaping to replace the temporary (Phase 1) drop off and car parking to the south, adjustment of existing ballcourts and 2 additional ballcourts for Kildare Town Educate Together, adjustment to existing car parking and 1 additional ballcourt for Gaelscoil Mhic Aodha, a service access off the existing access road to the south east along with circa 135m length of access road from Melitta Rd and all ancillary site development works. Revised by Significant Further Information which consists of: Alteration
Planning details
- Reference
- 2360321
- Local authority
- Kildare County Council
- Status
- Commenced · register status “APPLICATION FINALISED”
- Received
- 24 Oct 2023
- Observations close
- 28 Nov 2023 (closed 1043 days ago)
- Decision due
- 10 Oct 2024 · decided 9 Oct 2024
- Decision
- Conditional on 9 Oct 2024
- Proposed development
- for the phased construction of a new 2 storey, 37 classroom post primary school (Curragh Community College) with a total floor area of circa 10,883.8sqm along with ancillary accommodation including an external bin store, electricity substation, external caretakers office, storage shed, heat pump enclosure, car parking, drop off, bicycle parking, grass playing pitch (to be shared with adjoining Kildare Town Educate Together and Gaelscoil Mhic Aodha), external ballcourts, including adjusted/ additional ballcourts in the grounds of Kildare Town Educate Together and Gaelscoil Mhic Aodha, Photovoltaic panels on roof, circa 135m length of access road from Melitta Rd, a service road connection off the existing access road to the south east of the site and all ancillary site development works. Phase 1 will include the construction of c.4,982sqm of (2 storey) school accommodation incorporating photovoltaic panels on roof, 16 classrooms, specialist classrooms, sports changing rooms, fitness suite, temporary staffroom and GP Hall / dining space (to be converted to specialist classrooms in Phase 2), along with ancillary accommodation including an external bin store, electricity substation, external caretaker office, storage shed, bicycle parking and 2 No. ballcourts and heat pumps. Phase 1 also includes a temporary permission for an interim school entrance on the south façade, temporary drop off and car parking area, a temporary school vehicular and pedestrian access off the existing access road to the south east and all associated site development works. Phase 2 will include the completion of c.5901.8 sqm of (2 storey) school accommodation incorporating 21 classrooms, specialist classrooms, a general purpose hall, a PE hall, a special needs unit, library, staff room and all ancillary accommodation. Phase 2 also includes 92 No car parking spaces, additional bicycle parking, an SEN garden, a drop off, a grass pitch area, 3 additional ballcourts plus hard and soft landscaping to replace the temporary (Phase 1) drop off and car parking to the south, adjustment of existing ballcourts and 2 additional ballcourts for Kildare Town Educate Together, adjustment to existing car parking and 1 additional ballcourt for Gaelscoil Mhic Aodha, a service access off the existing access road to the south east along with circa 135m length of access road from Melitta Rd and all ancillary site development works. Revised by Significant Further Information which consists of: AlterationAs published by the register.
- Site area
- 4.87 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 47 · 500 m · 5 years
- Granted1262 Campion Crescent , Kildare Town , Co. Kildare
- RefusedLands at , Magee Quarter , Kildare Town
- Granted"CENTRA" , Melitta Road , Kildare Town
- OpenBretts’ Centra Maryville , Kildare Town , Co. Kildare.
- WithdrawnBretts’ Centra , Maryville , Kildare Town
- WithdrawnBretts’ Centra , Maryville , Kildare Town
- GrantedLands at Magee Quarter , Kildare Town , County Kildare
- Granted15 Ruanbeg Drive , Kildare , County Kildare
Show all 47
- GrantedKildare Business Park , Melitta Road , Kildare Town
- Refused1262 Campion Crescent , Kildare Town , Co. Kildare
- Granted2 Curragh Plains , Kildare Town , Co. Kildare
- Withdrawn2 Curragh Plains , Kildare Town , Co. Kildare
- GrantedKildare Enterprise Centre , Melitta Road , Kildare Town
- WithdrawnKildare Enterprise Centre , Melitta Road , Kildare Town
- Granted2972 Maryville Grove , Kildare Town , Co. Kildare
- GrantedKildare Business Park , Unit F1 Melitta Road , Kildare Town
- GrantedLands at the former Magee Barracks Site , Hospital Street , Kildare Town
- Commenced1272 Campion Crescent , Kildare Town , Co. Kildare
- Granted28 Ruanbeg Way , Ruanbeg Manor , Kildare
- GrantedWoodside , Melitta Road , Kildare
- Granted2959 Maryville Grove , Kildare Town , Co Kildare
- GrantedNo 733 Rowanville , Kildare , Co Kildare.
- GrantedGaelscoil Mhic Aodha , Melitta Road , Kildare
- Refused654 Melitta Road , Kildare Town , Co. Kildare
- Granted1249 (a) Campion Crescent , Kildare Town , County Kildare
- Withdrawn1249A Campion Crescent , Kildare Town , Co. Kildare
- Commenced1248 Campion Crescent , Kildare Town , Co. Kildare.
- Withdrawn1249A CAMPION CRESCENT , KILDARE TOWN , CO. KILDARE
- Granted2512 Woodside Park , Maryville , Kildare Town
- Withdrawn1248 Campion Crescent , Kildare town , Co. Kildare.
- RefusedKildare Business Park , Melitta Road , Kildare Town
- WithdrawnKildare Business Park , Melitta Road , Kildare Town
- Withdrawn1248 Campion Cresent , Kildare Town , Co. Kildare
- GrantedApartment 17 Block 5 , Ruanbeg Crescent , Ruanbeg Manor
- Appeal decidedRuanbeg , Townlands of Kildare & Collaghknock , Glebe
- CommencedNo. 2 Ruanbeg Drive , Ruanbeg Manor , Kildare
- CommencedKildare Enterprise Centre , Melitta Road , Kildare Town
- Granted1 Coolaghknock Avenue , Melitta Road , Kildare Town
- GrantedThornhill , Assumpta Villas , Kildare Town
- Granted1479 Assumpta Villas , Kildare Town , Co. Kildare.
- Appeal decidedMelitta Road , Kildare Town , Co. Kildare.
- Granted17 Ruanbeg Green , Ruanbeg Manor , Kildare
- Appealed728 Rowanville , Kildae Town , Co. Kildare.
- Granted746 Rowanville , Kildare Town , Co. Kildare.
- Granted1262 Campion Crescent , Kildare Town , Co. Kildare.
- Granted22 Ruanbeg Crescent , Kildare , Co. Kildare.
- GrantedGaelscoil Mhic Aodha , Melitta Road , Kildare
Homes nearby
- For sale43 The Plains, Kildare, Co. Kildare, R51 PH32
- For sale48 Ruanbeg Close, Ruanbeg Manor, Kildare, Co. Kildare, R51 YV12
- For saleMagee Quarter, Kildare Town, Kildare, Co. Kildare
- For sale14 Ruanbeg Avenue, Kildare, Co. Kildare, R51 YN35
- For sale35 Ridgewood Manor, Kildare, Co. Kildare, R51 TK23
- For saleWhitesland, Rathbride Road, Kildare Town, Co. Kildare
- Withdrawn3236 Maryville, Kildare Town, Co. Kildare, R51 XF41
- WithdrawnApartment 48, Block 9, Ruanbeg Walk, Kildare, Co. Kildare, R51 N620
- Withdrawn1449 Assumpta Villas, Kildare, Co. Kildare, R51 AD65
- WithdrawnApartment 12, Block 3, Ruanbeg Close, Ruanbeg Manor, Kildare, Co. Kildare, R51 R207
- Withdrawn16 Ruanbeg Avenue, Ruanbeg Manor, Kildare, Co. Kildare, R51 RX52
- Sold264 Bothar Mhic Aodh, Magee Quarter, Co. Kildare
Appeal
Appeal ABP-321159-24 (status unknown), not yet matched.
Building started
- 19 Jun 2026 · Builder told the council work was starting CN0143686KE
Zoning
A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
Reserved for the schools, creches, community and health facilities a neighbourhood needs.
Protections nearby 250 m
No mapped flood area nearby.
- Radon risk area · 1
- Recorded monument · 1
Where this comes from
National planning feed (NPAD), fetched 22 Sept 2026, 16:10.
Source: npad · fetched 22 Sept 2026, 16:10
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 22 Sept 2026, 16:10 | open |
Summary
2360321 is a planning application to Kildare County Council for for the phased construction of a new 2 storey, 37 classroom post primary school (Curragh, received on 24 Oct 2023; permission was granted with conditions on 9 Oct 2024.