Gorteen Lower , Nurney , Co. Kildare
- 12 Sept 2023Received
- 15 Feb 2024Conditional
- 18 Nov 2024Final grant
- 17 Nov 2029Permission expires
- Status
- Appeal decided — other
- Decision
- Conditional · 15 Feb 2024
- Council
- Kildare County Council
- Type
- PERMISSION
- Site
- 2.63 ha
What’s proposed
new ancillary structures relating to the operating of the existing biogas facility as follows: 1. Biofilter & Air Scrubber (including exhaust stack affixed to existing reception building at max. height of 14m above ground level). 2. LPG Tanks Compound. 3. Enclosed Flare. 4. Provision of 3 No. Storage Digestors with gas storage domes (max. height c.13m). 5. Biogas Upgrader (including Absorption Column 15.257m and a Stripper Column 12.8m). 6. Compressor. 7. Additional standby CHP 2 Enclosure. 8. LPG Boilers. 9. Carbon Filters. 10. Abstraction Sump. 11. Switch Room. 12. Vertical biofilter. 13. Co2 liquefaction plant (max. height 11.3m). 14. New bund wall around the perimeter of the site (max. 0.5m above ground level. 15. Attenuation Tank and all associated site works including decommissioning of existing lagoons and new surface water arrangements. Revised by Significant Further Information
23894 is a planning application to Kildare County Council for new ancillary structures relating to the operating of the existing biogas facility as, received on 12 Sept 2023; permission was granted with conditions on 15 Feb 2024.
Planning details
- Reference
- 23894
- Local authority
- Kildare County Council
- Status
- Appeal decided — other · register status “APPEALED FINANCIAL”
- Received
- 12 Sept 2023
- Observations close
- 17 Oct 2023 (closed 1063 days ago)
- Decision due
- 26 Feb 2024 · decided 15 Feb 2024
- Decision
- Conditional on 15 Feb 2024
- Proposed development
- new ancillary structures relating to the operating of the existing biogas facility as follows: 1. Biofilter & Air Scrubber (including exhaust stack affixed to existing reception building at max. height of 14m above ground level). 2. LPG Tanks Compound. 3. Enclosed Flare. 4. Provision of 3 No. Storage Digestors with gas storage domes (max. height c.13m). 5. Biogas Upgrader (including Absorption Column 15.257m and a Stripper Column 12.8m). 6. Compressor. 7. Additional standby CHP 2 Enclosure. 8. LPG Boilers. 9. Carbon Filters. 10. Abstraction Sump. 11. Switch Room. 12. Vertical biofilter. 13. Co2 liquefaction plant (max. height 11.3m). 14. New bund wall around the perimeter of the site (max. 0.5m above ground level. 15. Attenuation Tank and all associated site works including decommissioning of existing lagoons and new surface water arrangements. Revised by Significant Further InformationAs published by the register.
- Site area
- 2.63 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 53.07474, -6.93561
Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
The register records appeal 319226-24 (status unknown) but we have not matched the ACP case yet.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 132904). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/KildareCC/AppFileRefDetails/23894/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |