Athea Upper , Athea , Co. Limerick.
- 21 Dec 2017Received
- 25 May 2018Conditional
- 27 Jun 2018Final grant
- 26 Jun 2028Permission expires
- Status
- Granted with conditions
- Decision
- Conditional · 25 May 2018
- Council
- Limerick City and County Council
- Type
- PERMISSION
- Site
- 6.66 ha
What’s proposed
a 10 year planning permission for the laying of 4.4 km of underground electrical cables, associated ducting, associated cable draw pits, electrical cabinets, excavation/trenching works, provision of a new substation compound with a single storey substation building and associated services. The underground electrical cable route is primarily on public road with a section on other road. Details of the underground cables and extent of the works are shown on the planning application drawings. The proposed underground electricity cable will connect the permitted Beennanaspuck Wind Farm (Kerry County Council Planning Ref. 14/571; An Bord Pleanala Ref. PL08.245464) and permitted Toberatooreen Wind Farm (Kerry County Council Planning Ref. 12/431 and 14/854; An Bord Pleanala Planning Ref. PL08.242170), which are located in County Kerry, to the National Electricity Grid via the Athea substation in County Limerick
171228 is a planning application to Limerick City and County Council for a 10 year planning permission for the laying of 4.4 km of underground electrical cables, received on 21 Dec 2017; permission was granted with conditions on 25 May 2018.
Planning details
- Reference
- 171228
- Local authority
- Limerick City and County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 21 Dec 2017
- Observations close
- 5 Feb 2018 (closed 3149 days ago)
- Decision due
- 29 May 2018 · decided 25 May 2018
- Decision
- Conditional on 25 May 2018
- Proposed development
- a 10 year planning permission for the laying of 4.4 km of underground electrical cables, associated ducting, associated cable draw pits, electrical cabinets, excavation/trenching works, provision of a new substation compound with a single storey substation building and associated services. The underground electrical cable route is primarily on public road with a section on other road. Details of the underground cables and extent of the works are shown on the planning application drawings. The proposed underground electricity cable will connect the permitted Beennanaspuck Wind Farm (Kerry County Council Planning Ref. 14/571; An Bord Pleanala Ref. PL08.245464) and permitted Toberatooreen Wind Farm (Kerry County Council Planning Ref. 12/431 and 14/854; An Bord Pleanala Planning Ref. PL08.242170), which are located in County Kerry, to the National Electricity Grid via the Athea substation in County LimerickAs published by the register.
- Site area
- 6.66 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby nothing else within 500 m in the last 5 years
No other application within 500 m in the last 5 years.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 404429). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://eplanning.ie/LimerickCCC/AppFileRefDetails/171228/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |