County Arms Hotel, Railway Road Birr, Co. Offaly R42 Y568

Approved in Jul 2022. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

  1. 20 Apr 2022Received
  2. 14 Jun 2022Conditional
  3. 26 Jul 2022Final approval
  4. 25 Jul 2027Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Conditional · 14 Jun 2022
Reference
22201
Received
20 Apr 2022
Site
2.85 ha

What’s proposed

(I) WORKS TO THE REAR EAST ELEVATION AT GROUND FLOOR LEVEL, TO INCLUDE STRIPPING WINDOWS FROM SILL TO FLOOR LEVEL, TO ACCESS NEW GROUND FLOOR TERRACES TO THE EAST OF THE HOTEL BEDROOM BLOCK.

Show all

(II) THE CONSTRUCTION OF A NEW DINING ROOM EXTENSION TO THE NORTH ELEVATION AT FIRST FLOOR LEVEL, RECONFIGURING EXISTING EXTERNAL STEPPED ACCESS TO WALLED GARDEN, AND INTERNAL ALTERATIONS AT FIRST FLOOR LEVEL TO IMPROVE DISABLED ACCESS. REVISIONS TO HIPPED ROOF AT FIRST FLOOR LEVEL TO ACCOMMODATE HEAD HEIGHTS INTERNALLY AT RAMPED ACCESS ROUTE. (III) WORKS TO SECOND FLOOR TO CHANGE FROM EXISTING SLOPED ROOF TO FLAT ROOF, WITH NEW WINDOWS TO NORTH ELEVATION. (IV) EXTERNAL WORKS TO INCLUDE THE ADDITION OF A POND FEATURE TO THE WEST OF THE HOTEL SITE, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. (THE PROPOSED DEVELOPMENT IS WITHIN THE CURTILAGE OF PROTECTED STRUCTURES OCC RPS NO.53-361 NIAH REG NO. 14819293)

3 other applications within 500 m in the last year

Open the report

Nearby 3 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Zoning

C3 — High technology

Zoned for office, research and development and high-technology manufacturing.

G5 — Open space and amenity

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

R1 — New residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

S5 — Sustainable neighbourhood infrastructure

Reserved for the schools, creches, community and health facilities a neighbourhood needs.

Protections nearby 250 m

  • NIAH-recorded building · 7
    The Gas Works; water pump
  • Recorded monument · 1
    R141449
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

22201 is a planning application to Offaly County Council for (i) works to the rear east elevation at ground floor level, to include stripping windows, received on 20 Apr 2022; permission was granted with conditions on 14 Jun 2022.