PlanningRegister.ie
Offaly County Council · 2460120

Townparks & Seffin, Birr, Co. Offaly

Approved in May 2025. Built and signed off.

  1. 11 Apr 2024Received
  2. 15 Apr 2025Conditional
  3. 22 May 2025Final approval
  4. 13 Jun 2025Building started
  5. 5 Jun 2026Signed off

Planning details

Status
Building started
Decision
Conditional · 15 Apr 2025
Reference
2460120
Received
11 Apr 2024
Further information
Requested 5 Jun 2024 · received 30 Sept 2024
Units
58
Site
3.45 ha

What’s proposed

The construction of 58 total no. residential units comprising of: (A) 2no. three-bedroom two-storey semi-detached (Type H); 1no. 2-bedroom bungalow (Type L2); 10no. 1&2-bedroom terraced bungalows in three blocks (Type L3/L4); 12no. two-bedroom two-storey terraced units in two blocks (Type M); and 4no. two-bedroom two-storey terraced units (Type N) (Total 29no. dwellings) at Macregol Páirc;

Show all

(B) 8no. four-bedroom two-storey detached house (Type P); 1no.two-storey detached four-bedroom house (Type A2); 14no. two-storey four-bedroom semi-detached houses (Type Q); 4no. two-storey three-bedroom dual aspect semi-detached houses (Type R/R1); 2no. two-storey three-bedroom dual aspect semi-detached houses (Type R2/R3) (total 29no. dwellings) at Corr na Meala. (C) The construction of section of new distributor road, pathways and cycle track with access to developments listed above; (D) The provision of all groundworks, service connections, site drainage, internal paths, paving, parking, public lighting, public open space; and all associated site development works to complete…

Cut short by the council feed. Full text ↗

2 other applications within 500 m in the last year

Open the free report

Nearby 2 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Building started

  • 5 May 2026 · Builder told the council work was starting CN0141411OY
  • 1 Sept 2025 · Builder told the council work was starting CN0132948OY
  • 13 Jun 2025 · Builder told the council work was starting CN0129795OY

Zoning

G5 — Open space and amenity

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

R1 — New residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

S5 — Sustainable neighbourhood infrastructure

Reserved for the schools, creches, community and health facilities a neighbourhood needs.

Protections nearby 250 m

  • NIAH-recorded building · 2
    icehouse; country house
Where this comes from

National planning feed (NPAD), fetched 11 Nov 2026, 23:00.

Source: National Planning Application Database · fetched 11 Nov 2026, 23:00
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Nov 2026, 23:00open
Summary

2460120 is a planning application to Offaly County Council for the construction of 58 total no. residential units comprising of: (A) 2no. three-bedroom, received on 11 Apr 2024; permission was granted with conditions on 15 Apr 2025.