Belgard Square North
Approved in Oct 2020. Built and signed off.
This is Belgard Square North, by South Dublin County Council (Housing). Read the scheme page →
- 10 Aug 2020Received
- 12 Oct 2020Part 8 approved by council
- 2 Jun 2023Building started
- 19 Dec 2024Signed off
- Status
- Building started
- Decision
- Part 8 approved by council · 12 Oct 2020
- Council
- South Dublin County Council
- Type
- Application Under Part 8
- Site
- 4,963 m²
Live near Belgard Square North?
Everything else planned on your street, in one report.
Check my streetWhat’s proposed
Construction of 133 affordable rental apartments with a community facility (c.12,918sq.m) in three blocks ranging from three to eight storeys with associated balconies/ terrace for each apartment and roof mounted solar panels linked by a single storey podium. • Block A (west- c. 5,162sq.m) accommodates 2 studios, 31 1-bed apartments and 28 2-bed apartments. • Block B (east – c 5,903sq.m) accommodates 1 studio, 33 1-bed apartments, 35 2-bed apartments, 1 3-bed apartment and the community facility. • Block C (south – 255sq.m) accommodates 2 3-bed, 3 storey maisonette apartments. • Podium (c.1598sq.m) accommodates 39 car parking spaces which includes 3 universal access spaces, 246 secure bicycle spaces, ESB substation and switch room, plant rooms, bins and other maintenance stores. • Ancillary site development works include the provision of pedestrian zip link/greenway, access roadway, footpaths, 24 bicycle spaces, hard and soft landscaping, new boundary treatments and a landscaped courtyard at podium level on SDCC lands west of the new link road connecting Fourth Avenue and Belgard Square North, Tallaght, Dublin 24. The proposal has undergone Appropriate Assessment Screening under the Habitats Directive (92/43/EEC) and screening for Environmental Impact Assessment under the EIA Directive 2014/52/EU, and the Planning Authority has concluded that there will be no real likelihood of significant effects on the environment arising from the proposed development and therefore an Environmental Impact Assessment is not required. Any person may, within 4 weeks from the date of publication of this notice, apply to An Bord Pleanála for a screening determination as to whether the development would be likely to have significant effects on the environment. Persons wishing to inspect drawings of the proposed development should contact the Planning Department by emailing planningdept@sdublincoco.ie or by phoning (01) 4149000. Due to Covid-19 restrictions, plans and particulars of the proposed development will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy only by appointment at County Hall, Tallaght, Dublin 24 during normal working hours during the period from 6th of August, 2020 to the 4th of September 2020. The plans are available online on the Council’s Public Consultation Portal website, http://consult.sdublincoco.ie during the period from 6th of August 2020 to the 18th of September 2020. Submissions and observations with respect to the proposed development dealing with the proper planning and sustainable development of the area in which the proposed development will be situated, may be made in writing up to 16:30 by hand/post and up to 23:59 for online submission on the 18th of September, 2020 and may be submitted either via: Online Submissions: http://consult.sdublincoco.ie or Post to: Senior Executive Officer, Housing, Social & Community Development, South Dublin County Council, County Hall, Tallaght, Dublin 24 YNN5
Planning details
- Reference
- SD208/0007
- Local authority
- South Dublin County Council
- Status
- Commenced · register status “Unregistered application”
- Received
- 10 Aug 2020
- Observations close
- 14 Sept 2020 (closed 2226 days ago)
- Decision
- Part 8 approved by council on 12 Oct 2020
- Site area
- 4,963 m² from the mapped boundary, not the council's figure
- Applicant
- South Dublin County Council council register
Nearby 54 · 500 m · 5 years
- OpenUnit 4, Ground Floor level, Airton Plaza, Airton Road, located at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24.
- Awaiting decision77-78 Seville Place, 38 Lower Oriel Street, 60 Fourth Avenue, Dublin 1.
- Awaiting decisionUnit 1, Block A, Airton Plaza, Airton Road, Tallaght, Dublin 24, D24 PY6R
- Awaiting decisionSouth Dublin County Council County Hall and Library, Tallaght, Dublin 24, D24 X0WP
- GrantedUnits D-03 & D-07, Block D, Belgard Square West, Tallaght Town Centre, Dublin 24
- Awaiting decisionRua Red, Tallaght, Dublin, D24 KV8N
- Awaiting decisionCivic Theatre, Parthalán Place, Belgard Rd, Tallaght, Dublin, D24 NWN7
- GrantedUnits 66 and 67, Fourth Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24.
Show all 54
- Granted738, Virginia Heights, Dublin, D24CC6T
- GrantedTallaght Cross Hotel, Tallaght Cross West, Tallaght, Dublin 24, D24VX61
- GrantedUnit 4, The Square Industrial Complex, Belgard Square East, Tallagh, DUBLIN 24
- WithdrawnWorkIQ, Innovation Quarter, Belgard Square North, Tallaght, Dublin 24, D24E1TT
- WithdrawnWorkIQ, Innovation Quarter, Belgard Square North, Tallaght, Dublin 24, D24E1TT
- Granted5A, Colbert's Fort Cottages, Tallaght, Dublin 24
- GrantedUnit 1 B, Ground Floor, Tallaght Cross, Tallaght, Dublin 24.
- WithdrawnUnit 24, Allied Logistics Musgrave Limited, Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24.
- Appeal decidedA site of approximately 1.19 Ha at Belgard Square East, Belgard Road and Old Blessington Road, Tallaght, Dublin 24
- GrantedUnits 66 & 67 Fourth Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
- GrantedGlen Abbey Complex, Belgard Road, Cookstown Industrial Estate, Dublin 24, D24 W2XA
- GrantedUnit 2 / 3, Airton Plaza, Airton Road, Tallaght, Dublin D24 PY6R, & D24 HF6C
- Granted33, Alderwood Green, Tallaght, Dublin 24, D24 P9C9
- GrantedESB Telecommunications Compound, Belgard 38KV Substation, Belgard Road, Tallaght, Dublin 24
- CommencedUnits U238- U241, Level 2, The Square, Belgard Square East, Dublin 24, D24X030
- GrantedBelgard Retail Park, Belgard Road, Tallaght, Dublin 24
- GrantedService yard, B&Q, Unit 5, Belgard Retail Park, Belgard Road, Tallaght, Dublin, D24 W5RV
- GrantedFormer ABB Building, Belgard Square East, Tallaght, D24 KD78
- CommencedPM Group, Kearney House, Belgard Square East, Tallaght, Dublin 24, D24 XFW2
- GrantedABB Building, Belgard Square East, Tallaght, D24KD78
- GrantedUnits 66 and 67 Fourth Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24.
- GrantedUnit 23, Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24, D24 FP95
- GrantedFourth Avenue, Cookstown Industrial Estate, Adjoining & Bounded by Tallaght University Hospital, Tallaght, Dublin 24, D24 K599
- GrantedCorner of Airton Road and Belgard Road, Tallaght, Dublin, D24 HD35
- GrantedSite at the Corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35
- RefusedUnit A3, Ground Floor Restaurant, Block A, Tallaght Cross Belgard Square, Belgard Square, Tallaght Town Centre, Dublin 24, D24 RX94
- Granted5, Tig Mo Croí, Colbert's Fort Cottages, Tallaght, Dublin 24, D24 KW1E
- GrantedB&Q, Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, D24 W5RV.
- Appeal decidedUnit 21, First Avenue, Cookstown Industrial Estate, Dublin 24
- WithdrawnUnit 21, First Avenue, Cookstown Industrial Estate, Dublin 24
- GrantedOld Blessington Road (East of the Civic Theatre), Tallaght, Dublin 24
- GrantedBlock C, Chamber House, Library Square, Town Square, Tallaght, Dublin 24
- CommencedUnit 29, Second Avenue, Cookstown Industrial Estate, Dublin 24
- CommencedPlot Adjacent 4 Colberts Fort, Tallaght, Dublin 24.
- GrantedLand at Tallaght University Hospital, Tallaght, Dublin 24
- GrantedAirton Road Extension - (Cookstown Industrial Estate Road to Belgard Road), Tallaght, DUBLIN 24
- WithdrawnTallaght University Hospital, Tallaght, Dublin 24, D24 NR04
- RefusedUNIT 29, Second Avenue, Cookstown Industrial Estate, Dublin 24
- GrantedPeachtree East Restaurant, Unit A3, Tallaght Cross East, Dublin 24
- Appeal decidedUnit 21, First Avenue, Cookstown Industrial Estate, Dublin 24
- GrantedHealy Chemicals Ireland Ltd, HCL House, Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
- RefusedBelgard Road, Belgard Square East, Blessington Road, Tallaght, Dublin 24
- RefusedThe Former ABB Site, Belgard Road, Tallaght, Dublin 24
- Granted23, Alderwood Green, Dublin 24
- GrantedUnit 70, Cookstown Estate Road, Cookstown Industrial Estate, Tallaght, Dublin 24
- WithdrawnUnit 70, Cookstown Estate Road, Cookstown Industrial Estate, Tallaght, Dublin 24
Homes nearby
- For sale47 Exchange Hall, Belgard Square North, Tallaght, Dublin 24, D24 HD30
- For sale35 Alexander Court, Tallaght, Dublin 24
- For saleApartment 20, Alen Hall, Belgard Square, Tallaght, Dublin 24, D24 XE35
- For sale1 Virginia Hall, Tallaght, Dublin 24
- For sale20 Losset Hall, Belgard Square, Tallaght, Dublin 24, D24 EF85
- For saleApartment 15, Tallow Hall, Belgard Square, Tallaght, Dublin 24, D24 E284
Development land nearby
From Buildable, our sister site for development land in Dublin.
- Permitted, not started · 99 homes granted 10 Sep 2026, expires 10 Sep 2031 — Fourth Avenue Cookstown Industrial Estate (0.1 km)
- Permitted, not started · 199 homes granted 27 May 2026, expires 27 May 2031 — Belgard Square East (0.5 km)
- Permitted, not started · 170 homes granted 21 Sep 2021, expires 24 Nov 2030 — Glen Abbey Complex (0.6 km)
- Mixed-use land off Exchange Hall, Belgard Square, Dublin 24 (0.0 km)
- Public land off Exchange Hall, Belgard Square, Dublin 24 (0.1 km)
Building started
- 2 Jun 2023 · Builder told the council work was starting CN0101340SD
Zoning
A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.
Protections nearby 250 m
- EPA-licensed facility · 3
Where this comes from
National planning feed (NPAD), fetched 11 Sept 2026, 18:51.
Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 11 Sept 2026, 18:51 | open |
Summary
SD208/0007 is a planning application to South Dublin County Council for construction of 133 affordable rental apartments with a community facility, received on 10 Aug 2020; permission was granted on 12 Oct 2020.