PlanningRegister.ie
South Dublin County Council · SD238/0007

Bawnogue District Centre

Approved in 2024. No sign of building yet.

This is Bawnogue District Centre, by South Dublin County Council (Roads Dept). Read the scheme page →

  1. 6 Nov 2023Received
  2. 12 Feb 2024Part 8 approved by council
  3. 12 Feb 2029Approval runs out

Earlier approval here ran out with no sign of building: SD17A/0316 (2017)

Status
Approved
Decision
Part 8 approved by council · 12 Feb 2024
Council
South Dublin County Council
Type
Application Under Part 8
Site
1.44 ha

Live near Bawnogue District Centre?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

The proposed scheme is to upgrade and enhance the local community of Bawnogue, making it more accessible, sustainable, and attractive for residents, businesses, and visitors. This includes work to the local streetscape along Bawnogue Road by introducing traffic calming measures, promoting active travel, and introducing wider pedestrian areas with landscaping and SuDS elements throughout. • Road - narrowing existing carriageway to 6m. • Cycle facilities – Provision of a new segregated cycle route on western extents of Bawnogue Road. Improvements will also include the introduction of cycle parking facilities. • Pedestrian facilities – new multi-use plaza area in front of ACE Enterprise Park and the Community Centre/Creche. Works also include improved crossing facilities from adjacent shopping facilities to the east of Bawnogue Road to the ACE Enterprise Park and Community Centre areas. • Drainage – Introduction of SuDS elements in existing soft landscaping verge on eastern extents of Bawnogue Road to help treat and attenuate surface water runoff throughout the scheme. • Car Parking – rationalising of available carparking space. Bawnogue Shopping Centre car parking facilities and pedestrian access will be improved. Space in adjacent car parks to be utilised to allow additional space in scheme to be used for enhanced pedestrian and non motorised user facilities. • Junctions – junction geometry to be tightened in line with DMURS to help lower traffic speeds within area. Where feasible, raised tables to be introduced at junctions/crossing points to act as traffic calming measures and provide level, step-free facilities for pedestrians throughout the scheme

Planning details

Reference
SD238/0007
Local authority
South Dublin County Council
Status
Granted · register status “Unregistered application”
Received
6 Nov 2023
Observations close
11 Dec 2023 (closed 1028 days ago)
Decision due
No due date published
Decision
Part 8 approved by council on 12 Feb 2024
Proposed development
The proposed scheme is to upgrade and enhance the local community of Bawnogue, making it more accessible, sustainable, and attractive for residents, businesses, and visitors. This includes work to the local streetscape along Bawnogue Road by introducing traffic calming measures, promoting active travel, and introducing wider pedestrian areas with landscaping and SuDS elements throughout. • Road - narrowing existing carriageway to 6m. • Cycle facilities – Provision of a new segregated cycle route on western extents of Bawnogue Road. Improvements will also include the introduction of cycle parking facilities. • Pedestrian facilities – new multi-use plaza area in front of ACE Enterprise Park and the Community Centre/Creche. Works also include improved crossing facilities from adjacent shopping facilities to the east of Bawnogue Road to the ACE Enterprise Park and Community Centre areas. • Drainage – Introduction of SuDS elements in existing soft landscaping verge on eastern extents of Bawnogue Road to help treat and attenuate surface water runoff throughout the scheme. • Car Parking – rationalising of available carparking space. Bawnogue Shopping Centre car parking facilities and pedestrian access will be improved. Space in adjacent car parks to be utilised to allow additional space in scheme to be used for enhanced pedestrian and non motorised user facilities. • Junctions – junction geometry to be tightened in line with DMURS to help lower traffic speeds within area. Where feasible, raised tables to be introduced at junctions/crossing points to act as traffic calming measures and provide level, step-free facilities for pedestrians throughout the scheme
As published by the register.
Site area
1.44 ha from the mapped boundary, not the council's figure
Applicant
South Dublin County Council council register

Nearby 22 · 500 m · 5 years

Show all 22

Explore this area on the map →

Homes nearby

Development land nearby

From Buildable, our sister site for development land in Dublin.

See all development land near here →

Zoning

G1 — Open space with recreation

Open space with active recreational amenities — pitches, courts, play areas.

M3 — Neighbourhood centre

A local centre: shops, services and apartments over them, serving the surrounding housing.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

No mapped flood area nearby.

  • Radon risk area · 2
    About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels
  • Recorded monument · 2
    Enclosure; R149485

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open
Summary

SD238/0007 is a planning application to South Dublin County Council for the proposed scheme is to upgrade and enhance the local community of Bawnogue, making it, received on 6 Nov 2023; permission was granted on 12 Feb 2024.