PlanningRegister.ie
South Dublin County Council · SD25A/0171W

Ballymount Road Lower, Walkinstown, Dublin 12, D12 FK31

Approved in Sept 2025.

  1. 18 Jul 2025Received
  2. 2 Sept 2025Approved
  3. 14 Oct 2025Final approval
  4. 13 Oct 2030Approval runs out
Status
Approved
Decision
Approved for retention · 2 Sept 2025
Council
South Dublin County Council
Type
Retention
Site
2.71 ha

What’s proposed

Permission for Retention for an Existing Single Storey Temporary Warehouse Structure, Located to the Rear of the Existing Warehouse Building, together with all associated site works and connection into existing services

Planning details

Reference
SD25A/0171W
Local authority
South Dublin County Council
Status
Granted · register status “Final Grant”
Received
18 Jul 2025
Decision due
11 Sept 2025 · decided 2 Sept 2025
Decision
Grant permission for retention on 2 Sept 2025
Site area
2.71 ha from the mapped boundary, not the council's figure

Live near Ballymount Road Lower?

Everything else planned on your street, in one report.

Check my street
Council register ↗

One email to confirm. Unsubscribe in one click.

Nearby 4 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Zoning

M1 — Metro / rail economic corridor

A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • EPA-licensed facility · 3
    Galco Steel Limited; Heiton Buckley Limited

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

SD25A/0171W is a planning application to South Dublin County Council for permission for Retention for an Existing Single Storey Temporary Warehouse Structure, received on 18 Jul 2025; permission was granted on 2 Sept 2025.