Oakway Test Centre, Lower Ballymount Road, Walkinstown, Dublin 12, D12 KDN8

Approved in Feb 2026. Building started in 2026.

  1. 19 Nov 2025Received
  2. 21 Jan 2026Approved
  3. 24 Feb 2026Final approval
  4. 23 Nov 2026Building started

Planning details

Status
Building startedi
Decision
Approved · 21 Jan 2026
Reference
SD25A/0283
Received
19 Nov 2025
Site
450 m²

What’s proposed

Alterations to the building to facilitate the conversion of the existing Test Centre into a ''Drive - Through'' Test Centre in line with incoming RSA/CVRT regulatory policy. The alterations are mostly internal, including the re-positioning of partitions and the vehicular test equipment to facilitate the proposed 'drive - through' circulation route.

Show all

Externally, there are alterations to the front facade including the removal of the glazed screen of the existing disused showroom and the insertion in that area of two new vehicular openings that will be similar to the one existing vehicular opening

9 other applications within 500 m in the last year

Get the full report

Nearby 9 · 500 m · 12 months

Distance
Time
Show all 9

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Building started

  • 23 Nov 2026 · Builder told the council work was starting CN0150030SD

Zoning

M1 — Metro / rail economic corridor

A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • EPA-licensed facility · 3
    Irish Printed Circuits Limited; Hitech Plating
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

SD25A/0283 is a planning application to South Dublin County Council for alterations to the building to facilitate the conversion of the existing Test Centre, received on 19 Nov 2025; permission was granted on 21 Jan 2026.