PlanningRegister.ie
Sligo County Council · 21186

Finisklin, Sligo

Approved in Jun 2022. No sign of building yet.

  1. 11 Jan 2022Received
  2. 29 Apr 2022Conditional
  3. 7 Jun 2022Final approval
  4. 6 Jun 2027Approval runs out
Status
Approved
Decision
Conditional · 29 Apr 2022
Council
Sligo County Council
Type
PERMISSION
Units
1
Site
3.80 ha

What’s proposed

PP - development consisting of redevelopment at this site of our existing school. Part of the site is in the curtilage of the Ursuline Convent, a protected structure (FPS 43). The proposed development will consist of: - Demolition of ca. 1,556m2 of existing additions, extensions and temporary accommodation buildings; - Construction of New 4,357 m2 part 3-, and 2-, secondary school building, connected to existing 2006 2-storey extenion and Sports Hall building which is to be reconfigured, upgraded and its roof replaced; - Demolition of ca. 341m2 of additions and extensions adjoining historic buildings to be retained; - Refurbishment of and alterations to existing 1,506m2 1930 3-storey building with new lift extension and accessibility interventions; - Conservation works to existing 1860's Chapel and its repurposing as a music room; - Holding works for future use to 1860's building elements adjoining the Convent, a protected structure; - Holding works for future use to the 1860's building, which is proposed to return to being a stand-alone building after demolitions of additions and extensions thereto; - Separate staff car-park with vehicular access from existing northern gate to be modified and associated traffic works; - Upgrade to existing student vehicular drop-off, set-down and parking provisions to east; - Associated hard-surface play areas, landscaping, boundary treatments; - Associated surface water attenuation, foul and surface water drainage connections, site works and ancillary services; - Associated phased construction proposals to facilitate continuance of eduation provision during the works

Planning details

Reference
21186
Local authority
Sligo County Council
Status
Granted with conditions · register status “APPLICATION FINALISED”
Received
11 Jan 2022
Decision due
2 May 2022 · decided 29 Apr 2022
Decision
Conditional on 29 Apr 2022
Site area
3.80 ha from the mapped boundary, not the council's figure

Live near Finisklin?

Everything else planned on your street, in one report.

Check my street
Council register ↗

One email to confirm. Unsubscribe in one click.

Nearby 8 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Zoning

C2.1 — Economic development and employment

Zoned for employment uses. Housing is not the intended use here.

G1 — Open space with recreation

Open space with active recreational amenities — pitches, courts, play areas.

M3 — Neighbourhood centre

A local centre: shops, services and apartments over them, serving the surrounding housing.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

S3 — Community infrastructure

Reserved for civic, religious, community, education, health-care and social infrastructure.

Protections nearby 250 m

  • NIAH-recorded building · 4
    Saint Joseph's Ursuline Convent; Harbour Mills
  • Recorded monument · 1
    R160397

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

21186 is a planning application to Sligo County Council for PP - development consisting of redevelopment at this site of our existing school. Part, received on 11 Jan 2022; permission was granted with conditions on 29 Apr 2022.