Tipperary County Council · 19601430

Kyleagarry Kyle Ballyryan East and Gortdrum, Donohill, Co. Tipperary

Decided on appeal.

  1. 19 Dec 2019Received
  2. 29 Jun 2020Refused
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Appeal decided — refused
Decision
Refused · 29 Jun 2020
Council
Tipperary County Council
Type
PERMISSION
Site
71.22 ha

Live near Kyleagarry Kyle Ballyryan East and…?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

the construction of a 43MW Solar PV development comprising of ca. 155,000 no. photovoltaic panels laid out in arrays, the construction of a 38 kV substation, (ca. 114.9m2 X 4.75m tall) and transformer unit (ca. 15.25m2 X 2.4m tall) along with associated ancillary development including: 24 no. Power Hubs (ca. 15.25m” X 2.4m), which incorporate the inverters and the transformers within the same unit, 1 no. single storey communications building (11.1m” X 2.5m), 1 no. single storey client building (15.25m2 X 2.9m), 1 no. single storey equipment storage container (7.5m” X 2.7m), 15 no. CCTV cameras mounted on 4m high poles; and perimeter security fencing. The proposed development will also see the installation of ten (10 no.) ISO shipping container units for the purpose of battery storage (30.5 m” X 2.9m). The total development area will be ca. 70.5 ha

Planning details

Reference
19601430
Local authority
Tipperary County Council
Status
Appeal decided — refused · register status “APPLICATION FINALISED”
Received
19 Dec 2019
Observations close
3 Feb 2020 (closed 2436 days ago)
Decision due
29 Jun 2020 · decided 29 Jun 2020
Decision
Refused on 29 Jun 2020
Proposed development
the construction of a 43MW Solar PV development comprising of ca. 155,000 no. photovoltaic panels laid out in arrays, the construction of a 38 kV substation, (ca. 114.9m2 X 4.75m tall) and transformer unit (ca. 15.25m2 X 2.4m tall) along with associated ancillary development including: 24 no. Power Hubs (ca. 15.25m” X 2.4m), which incorporate the inverters and the transformers within the same unit, 1 no. single storey communications building (11.1m” X 2.5m), 1 no. single storey client building (15.25m2 X 2.9m), 1 no. single storey equipment storage container (7.5m” X 2.7m), 15 no. CCTV cameras mounted on 4m high poles; and perimeter security fencing. The proposed development will also see the installation of ten (10 no.) ISO shipping container units for the purpose of battery storage (30.5 m” X 2.9m). The total development area will be ca. 70.5 ha
As published by the register.
Site area
71.22 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 5 · 500 m · 5 years

Explore this area on the map →

Appeal

Appeal 307702-20 (status unknown), not yet matched.

Zoning

Not zoned in the current plan.

Protections nearby 250 m

No mapped flood area nearby.

  • Recorded monument · 10
    R135711; R135726

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: npad · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
npadCC-BY-4.018 Sept 2026, 15:44open
Summary

19601430 is a planning application to Tipperary County Council for the construction of a 43MW Solar PV development comprising of ca. 155,000 no., received on 19 Dec 2019; permission was refused on 29 Jun 2020.