PlanningRegister.ie
Tipperary County Council · 2260528

Dromin Road , Drummin , Nenagh

  1. 30 Sept 2022Received
  2. 4 Nov 2022Observations closed
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Withdrawn or invalid
Decision
Not yet
Council
Tipperary County Council
Type
PERMISSION
Site
78 m²

What’s proposed

51 no. residential units which will comprise the following: a) 2 no. 2 storey detached apartment blocks, each with 2 number 1 and 2 bed apartments on ground floor and 2 number 1 and 2 bed apartments on first floor (total number of apartments in the 2 blocks total 16 units) b) 11 no. 3 bed 2-storey end-terrace houses (Type J and Jh’), c) 21 no. 2 bed 2-storey mid-terrace houses (Type K and Kh’), d) 3 no. 3 bed 2-storey end-terrace houses (Type L and Lh’), the demolition of 3 number unfinished 2 storey dwellings and demolition of 3 number foundations and bases for 3 number 2 storey dwellings, all associated site works to include the following: new vehicular road and pedestrian access from the existing access on Dromin Road, new vehicular roads and pedestrian accesses from the extended access road, new boundary treatments, landscaping, public lighting, car parking, signage, bin storage & bicycle storage, together with all associated drainage connection works to include proposed surface water drainage to existing watercourse on Western boundary, proposed connection to existing foul sewer within site, water supply connection from existing water supply within site, together with all other associated site works

2260528 is a planning application to Tipperary County Council for 51 no. residential units which will comprise the following: a) 2 no. 2 storey detached, received on 30 Sept 2022; the file is recorded as incompleted application.

Planning details

Reference
2260528
Local authority
Tipperary County Council
Status
Withdrawn or invalid · register status “INCOMPLETED APPLICATION”
Received
30 Sept 2022
Observations close
4 Nov 2022 (closed 1420 days ago)
Decision due
No due date published
Decision
Not decided
Proposed development
51 no. residential units which will comprise the following: a) 2 no. 2 storey detached apartment blocks, each with 2 number 1 and 2 bed apartments on ground floor and 2 number 1 and 2 bed apartments on first floor (total number of apartments in the 2 blocks total 16 units) b) 11 no. 3 bed 2-storey end-terrace houses (Type J and Jh’), c) 21 no. 2 bed 2-storey mid-terrace houses (Type K and Kh’), d) 3 no. 3 bed 2-storey end-terrace houses (Type L and Lh’), the demolition of 3 number unfinished 2 storey dwellings and demolition of 3 number foundations and bases for 3 number 2 storey dwellings, all associated site works to include the following: new vehicular road and pedestrian access from the existing access on Dromin Road, new vehicular roads and pedestrian accesses from the extended access road, new boundary treatments, landscaping, public lighting, car parking, signage, bin storage & bicycle storage, together with all associated drainage connection works to include proposed surface water drainage to existing watercourse on Western boundary, proposed connection to existing foul sewer within site, water supply connection from existing water supply within site, together with all other associated site works
As published by the register.
Site area
78 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 25 applications within 500 m in the last 5 years

Show all 25

Explore this area on the map →

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    No other designation nearby.

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 470391). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/2260528/0.

    Source: npad · fetched 18 Sept 2026, 15:44
    SourceLicenceFetchedLink
    npadCC-BY-4.018 Sept 2026, 15:44open