PlanningRegister.ie
Tipperary County Council · 2360273

Droim an Óir, Nenagh

Approved in Nov 2023. Building started in 2026.

The homes here are sold as Droim an Óir.

  1. 27 Apr 2023Received
  2. 3 Oct 2023Conditional
  3. 6 Nov 2023Final approval
  4. 29 Apr 2026Building started
Status
Building startedi
Decision
Conditional · 3 Oct 2023
Council
Tipperary County Council
Type
PERMISSION
Units
67
Site
12.05 ha

What’s proposed

67 no. residential units, The residential development will comprise the following: a) 38 no. 4 bed 2-storey semi-detached houses (Type C & Ch’), b) 1 no. 3 bed 2-storey semi-detached houses (Type G), c) 1 no. 3 bed 2-storey semi-detached houses (Type H), d) 24 no. 3 bed 2-storey semi-detached houses (Type F & Fh’), e) 1 no. 2 bed 1-storey end-terrace houses (Type Mh’), f) 1 no. 2 bed 1-storey mid-terrace houses (Type N), g) 1 no. 2 bed 1-storey end-terrace houses (Type O). Planning permission is also sought for all associated site works to include the following: new vehicular road and pedestrian access from the existing access on Dromin Road, new vehicular roads and pedestrian accesses from the extended access road, new boundary treatments, landscaping, public lighting, car parking, together with all associated drainage connection works to include proposed surface water drainage to existing watercourse on Western boundary, proposed connection to existing foul sewer within site, water supply connection from existing water supply within site, together with all other associated site works

Planning details

Reference
2360273
Local authority
Tipperary County Council
Status
Commenced · register status “APPLICATION FINALISED”
Received
27 Apr 2023
Decision due
9 Oct 2023 · decided 3 Oct 2023
Decision
Conditional on 3 Oct 2023
Site area
12.05 ha from the mapped boundary, not the council's figure

Live near Dromin Road?

Everything else planned on your street, in one report.

Check my street
Council register ↗

Nearby 9 · 500 m · 12 months

Distance
Time
Show all 9

Explore this area on the map →

Homes nearby

Building started

  • 29 Apr 2026 · Builder told the council work was starting CN0141756TT

Zoning

C6 — Waterfront

Zoned for waterfront and harbour-related development.

G5 — Open space and amenity

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

R1 — New residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

R4 — Residential

Land zoned for housing. Expect infill, extensions and — on larger plots — apartment or scheme applications that accord with the objective.

Protections nearby 250 m

  • Recorded monument · 6
    R137714; R137716

Where this comes from

National planning feed (NPAD), fetched 28 Oct 2026, 01:34.

Source: National Planning Application Database · fetched 28 Oct 2026, 01:34
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.028 Oct 2026, 01:34open
Summary

2360273 is a planning application to Tipperary County Council for 67 no. residential units, The residential development will comprise the following: a) 38, received on 27 Apr 2023; permission was granted with conditions on 3 Oct 2023.