Ballynilard, Tipperary, Co. Tipperary
Declared invalid.
- 19 Jan 2026Received
- 23 Feb 2026Observations closed
Planning details
- Status
- Withdrawn or invalid
- Reference
- 2660031
- Received
- 19 Jan 2026
- Site
- 6.75 ha
What’s proposed
RED III application for development which comprises the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The total gross floor area of the proposed development (including internal plant areas and ancillary structures) will be c. 3,301 sq.m.
Show all
The development will consist of the following: • 3 no. digesters (all c. 15.5m in height), 2 no. digestate storage structures (c. 15.5m and c. 12m in height), a liquid feed tank (c. 4m in height) and a pump room and O2 generation structure (with a GFA of c. 27 sq.m. and a height of c. 2.6m), located in the northern section of the site. • 4 no. pasteurisation tanks (each c. 6m in height), a post pasteurisation cooling tank (c. 4m in height) and a pre fertiliser manufacturing tank (c. 4m in height), located to the southeast of the main digesters. • A part single-storey and part two-storey reception hall (with a gross floor area (GFA) of c. 1,964 sq.m. and an overall height of c. 16.5m) to accommodate a laboratory, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to the reception hall, located to the centre of the site. • Two pump house structures, each with a height of c. 2.6m and GFAs of 14 sq.m. and 21 sq.m., will be provided to the west and east of the reception hall building respectively. • A single-storey solid digestate storage and a nutrient recovery building (with a GFA of c. 880 sq.m and an overall height of c. 12.4m) located to the east of the reception hall, in the central portion of the site. • Odour abatement plant (with an overall height of c. 7m) and equipment and a digestate offtake area will be provided to the east of the solid digestate storage and nutrient recovery building. • Construction of an ESB substation (with a GFA of c. 27 sq.m and a height of c. 3.4m), a grid injection unit (with a GFA of c. 22 sq.m and a height of c. 2.8m) (which will be connected to the gas grid by way of an underground connection by Gas Networks Ireland), a GNI / grid offtake skid, and a fire water storage tank (with a height of c. 7.7m) in the southern portion of the site. • Construction of 2 no. CO2 tanks (c. 10.7m in height), a CO2 loading pump (c. 2.6m in height), CO2 auxiliaries (c. 2.6m in height), CO2 liqueufactor (with an overall height of c. 8.2m), a CO2 compressor (with an overall height of c. 5.9m) and a CO2 pre-treatment skid (c. 3.5m in height), located…
Cut short by the council feed. Full text ↗
1 other application within 500 m in the last year
Open the reportNearby 1 · 500 m · 12 months
Protections nearby 250 m
- Recorded monument · 6
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
2660031 is a planning application to Tipperary County Council for RED III application for development which comprises the construction of an anaerobic, received on 19 Jan 2026; the file is recorded as incompleted application.