Ballynilard, Tipperary, Co. Tipperary
Open for comments until 16 Oct.
- 11 Sept 2026Received
- 16 Oct 2026Observations close
- 5 Nov 2026Decision due
- Status
- Open for observation · 5 days left to observe
- Decision
- Due 5 Nov 2026
- Council
- Tipperary County Council
- Type
- PERMISSION
- Site
- 6.63 ha
What’s proposed
RED III application for development which comprises the construction of an anaerobic digestion facility to produce renewable biomethane, and a bio-based fertiliser from organic material. The total gross floor area of the proposed development (including internal plant areas and ancillary structures) will be c. 3,301 sq.m. The development is a renewable energy development which is covered by the provisions of the Renewable Energy Directive III. The development will consist of the following: • Construction of 3 no. digesters (all c. 15.5m in height), 2 no. digestate storage structures (c. 15.5m and c. 12m in height), and a pump room and O2 generation structure (with a GFA of c. 27 sq.m. and a height of c. 2.6m), located in the northern section of the main site area. • 4 no. pasteurisation tanks (each c. 6m in height), a post pasteurisation cooling tank (c. 4m in height), and a pre fertiliser manufacturing tank (c. 4m in height), located to the southeast of the main digesters. • A liquid feed tank (c. 4m in height), a pump house (with a height of c. 2.6m and GFA of 14 sq.m), and a pump skid (c. 0.8m in height), located to the southwest of the main digesters. • A part single-storey and part two-storey reception hall (with a gross floor area (GFA) of c. 1,964 sq.m. and an overall height of c. 16.5m) to accommodate a laboratory, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to the reception hall, located in the central portion of the site. • A single-storey solid digestate storage and a nutrient recovery building (with a GFA of c. 880 sq.m and an overall height of c. 12.4m) located to the east of the reception hall, in the central portion of the site. • A pump house (with a height of c. 2.6m and GFA of 21 sq.m), a fuel storage tank (c. 1.6m in height), and a backup generator (c. 2.3m in height), located adjacent to the nutrient recovery building. • Odour abatement plant (with an overall height of c. 7m) and equipment and a digestate offtake area will be provided to the east of the solid digestate storage and nutrient recovery building. • construction of an emergency biogas flare (c. 11.3m in height), 2 no. biogas treatment skids (with an overall height of c. 4.1m), 2 no. biogas compression structures (with a height of c. 2.6m), a biogas upgrading module (with a maximum height of c. 4.6m and a GFA of c. 28 sq.m), a combined heat and power unit and panel room (with a height of c. 10m to top of flue), a biomethane boiler (
Planning details
- Reference
- 2660893
- Local authority
- Tipperary County Council
- Status
- Open for observation · register status “NEW APPLICATION”
- Received
- 11 Sept 2026
- Observations close
- 16 Oct 2026 (5 days left)
- Decision due
- 5 Nov 2026
- Decision
- Not decided
- Proposed development
- RED III application for development which comprises the construction of an anaerobic digestion facility to produce renewable biomethane, and a bio-based fertiliser from organic material. The total gross floor area of the proposed development (including internal plant areas and ancillary structures) will be c. 3,301 sq.m. The development is a renewable energy development which is covered by the provisions of the Renewable Energy Directive III. The development will consist of the following: • Construction of 3 no. digesters (all c. 15.5m in height), 2 no. digestate storage structures (c. 15.5m and c. 12m in height), and a pump room and O2 generation structure (with a GFA of c. 27 sq.m. and a height of c. 2.6m), located in the northern section of the main site area. • 4 no. pasteurisation tanks (each c. 6m in height), a post pasteurisation cooling tank (c. 4m in height), and a pre fertiliser manufacturing tank (c. 4m in height), located to the southeast of the main digesters. • A liquid feed tank (c. 4m in height), a pump house (with a height of c. 2.6m and GFA of 14 sq.m), and a pump skid (c. 0.8m in height), located to the southwest of the main digesters. • A part single-storey and part two-storey reception hall (with a gross floor area (GFA) of c. 1,964 sq.m. and an overall height of c. 16.5m) to accommodate a laboratory, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to the reception hall, located in the central portion of the site. • A single-storey solid digestate storage and a nutrient recovery building (with a GFA of c. 880 sq.m and an overall height of c. 12.4m) located to the east of the reception hall, in the central portion of the site. • A pump house (with a height of c. 2.6m and GFA of 21 sq.m), a fuel storage tank (c. 1.6m in height), and a backup generator (c. 2.3m in height), located adjacent to the nutrient recovery building. • Odour abatement plant (with an overall height of c. 7m) and equipment and a digestate offtake area will be provided to the east of the solid digestate storage and nutrient recovery building. • construction of an emergency biogas flare (c. 11.3m in height), 2 no. biogas treatment skids (with an overall height of c. 4.1m), 2 no. biogas compression structures (with a height of c. 2.6m), a biogas upgrading module (with a maximum height of c. 4.6m and a GFA of c. 28 sq.m), a combined heat and power unit and panel room (with a height of c. 10m to top of flue), a biomethane boiler (As published by the register.
- Site area
- 6.63 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 1 · 500 m · 5 years
Homes nearby
Zoning
Not zoned in the current plan.
Protections nearby 250 m
No mapped flood area nearby.
- Recorded monument · 10
Where this comes from
National planning feed (NPAD), fetched 22 Sept 2026, 16:10.
Source: npad · fetched 22 Sept 2026, 16:10
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 22 Sept 2026, 16:10 | open |
Summary
2660893 is a planning application to Tipperary County Council for RED III application for development which comprises the construction of an anaerobic, received on 11 Sept 2026; observations close on 16 Oct 2026 (5 days left).