Ballyduff Lower, Co. Waterford, P51 FX26
Approved in Jan 2023. Building started in 2023, signed off as finished in Oct 2024.
- 8 Nov 2022Received
- 19 Dec 2022Conditional
- 31 Jan 2023Final approval
- 1 Mar 2023Building started
- 8 Oct 2024Signed off
Planning details
- Status
- Building started
- Decision
- Conditional · 19 Dec 2022
- Reference
- 22950
- Received
- 8 Nov 2022
- Site
- 1,788 m²
What’s proposed
Development on a site of c.0.177ha at the Former Ballyduff Garda Station (A PROTECTED STRUCTURE-RPS No.WA750018). The development will consist of the change of use of the existing 3 no. storey Former Garda Station (c.180sqm.) including the internal refurbishment and reconfiguration of the existing structure, with revised internal layout to form 6no. bedroom Short-Stay Holiday Accommodation facility with associated…
Show all
ancillary living space, servicing and guest facilities. The dev. also includes the partial demolition of the existing 1no. storey outbuilding to the rear of the existing protected structure to the south of the main building, within the existing courtyard (c.10.6sqm. to be demolished, and the replacement of an expanded single storey extension (c.45.2sqm.) building to the south within the existing courtyard. This single storey extension will also provide for occasional community use/event space. This extension is to be linked to the existing main building via a proposed 15.8sqm. glazed link, which is to extend from the existing outbuilding eastern wall, connecting into the main building at the southern or primary façade of the building at lower ground floor level. The removal of the existing guardrails and window, partial removal of existing handrails, partial façade and hardstanding removal at lower ground floor level of the main building and partial removal of the eastern courtyard wall and boundary wall of the existing outbuilding is required to facilitate the glazed link. In addition, car parking is to be provided in a new designated set down area along the western boundary of the site. A new subterranean wastewater treatment system is proposed to the north of the main building. The development also includes the repointing and repair of the external stoneworks and walls; repair and refurbishment works to the roof, chimneys, rainwater goods and windows of the Protected Structure, where required; garden and bin stores; plant; chanes in level; external lighting; CCTV; landscaping; retaining walls; bat boxes; SUDs internal pathways and boundary treatments; cycle parking facility; piped infrastructure (incl. 2no. new French drains) and ducting; the relocation of the existing water pump within the existing courtyard; installation of 2 no. new security gates at the western boundary and all associated site excavation and development works above and below…
Cut short by the council feed. Full text ↗
2 other applications within 500 m in the last year
Open the reportNearby 2 · 500 m · 12 months
- GrantedBallyduff Community Field , Ballyduff Upper , Co. Waterford
- WithdrawnBallyduff Community Field , Ballyduff Upper , Co. Waterford
Homes nearby
Building started
- 1 Mar 2023 · Builder told the council work was starting (seven-day notice) SN0008318WD
Protections nearby 250 m
- NIAH-recorded building · 3
- Recorded monument · 1
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
22950 is a planning application to Waterford City and County Council for development on a site of c.0.177ha at the Former Ballyduff Garda Station (A PROTECTED, received on 8 Nov 2022; permission was granted with conditions on 19 Dec 2022.