PlanningRegister.ie
Waterford City and County Council · 23135

Ballyduff Lower Townland, Ballyduff, Co. Waterford

Approved in Jul 2023. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

  1. 25 Apr 2023Received
  2. 15 Jun 2023Conditional
  3. 19 Jul 2023Final approval
  4. 18 Jul 2028Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Conditional · 15 Jun 2023
Reference
23135
Received
25 Apr 2023
Units
1
Site
1,793 m²

What’s proposed

The installation of a waste water treatment system with raised percolation area, an interceptor on existing storm system, raise the ground floor level of the existing commercial building, alterations to front elevation of building, this including additional personnel door, raising head heights of existing personnel door / 2 no. windows, replace 2 no. sliding doors with roller shutter doors and associated site works. A Natura Impact Statement will be submitted to the Planning Authority with the application

2 other applications within 500 m in the last year

Open the report

Nearby 2 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Protections nearby 250 m

  • NIAH-recorded building · 3
    Ballyduff Garda Síochána Station; Ballyduff Bridge
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

23135 is a planning application to Waterford City and County Council for the installation of a waste water treatment system with raised percolation area, an, received on 25 Apr 2023; permission was granted with conditions on 15 Jun 2023.