Approved in Aug 2025. No sign of building yet.

  1. 13 Aug 2024Received
  2. 20 Aug 2025Conditional
  3. 20 Aug 2030Approval runs out
Status
Under appeal
Decision
Conditional · 20 Aug 2025
Council
Kildare County Council
Type
PERMISSION
Site
37.49 ha

Live near Townlands of Halverstown?

Everything else planned on your street, in one report.

Check my street
Council register ↗

One email to confirm. Unsubscribe in one click.

What’s proposed

for a Data Centre and will comprise of: The demolition of 3 no. dwelling houses, associated garages and farm outbuildings / agricultural buildings (total floor area 1,591m2); The construction of 6 no. two storey data centre buildings, each with loading bays, external plant area including electrical and mechanical plant rooms, fuel compound, sprinkler tanks and associated ancillary development; Data centre building Nos. 1, 2, 3, 4 and 6 will consist of: a data hall (24,756m2, overall height 19m), an administration block (2,505m2 overall height 15m) and include an external screened plant area of 18m in height and 6,164m2; Gas turbines, gas engine and battery energy storage systems will be provided within each plant area; Data centre building No. 5 will consist of: a data hall (24,756m2, overall height 19m), an administration block (2,505m2 overall height 15m) and include an external screened plant area of 18m in height and 6,375m2 in area and includes infrastructure for district heating; Gas turbines, gas engine and battery energy storage systems will be provided within the plant area; Adjacent to each data centre building will be a screened sprinkler tank compound (408m2 to 528 m2 in area) comprising of 3 no. above ground sprinkler pump containers, (1 no. 240m3 and 2 no. 268.8m3 containers) and a screened fuel compound (331m2 in area) comprising 1 no. 38m3 fuel pump container and 6 no. 64m3 tanks; and Solar panels with a total area of 3,600m2 will be provided on the roof of each data centre building and rainwater harvesting is included in the development. The proposed development of the Data Centre also comprises: A screened Gas Networks Ireland (GNI) compound (61m2 in area) with 1 no. kiosk (3m in height and 19.5m2 in area) with a biomethane gas injection point; A screened above Ground Installation (AGI) compound (1,753m2 in area) with 4 no. kiosks each of 3m in height and 51.5 m2 in area; A district heating building (5m in height and 341m2 in area) district heating plant and in ground piping for district heating system; Security hub building (4.1m in height and 42m2 in area) at main entrance to the proposed development; A single storey admin workshop/office (504m2 in area) and water treatment plant (315m2 in area) building (4.8m in height) and associated hydrant pump room (5m in height and 80m2 in area) and 2 no. hydrant pump room storage tanks (5m in height and c.251m3 in area); A new access/egress from the R409 and a new emergency access/egress from th

Planning details

Reference
2460787
Local authority
Kildare County Council
Status
Under appeal · register status “APPEALED”
Received
13 Aug 2024
Observations close
17 Sept 2024 (closed 765 days ago)
Decision due
20 Aug 2025 · decided 20 Aug 2025
Decision
Conditional on 20 Aug 2025
Site area
37.49 ha from the mapped boundary, not the council's figure

Nearby 3 · 500 m · 5 years

Explore this area on the map →

Homes nearby

Appeal

Appeal 323677-25 (status unknown), not yet matched.

Zoning

C6 — Waterfront

Zoned for waterfront and harbour-related development.

C7 — Rural business

Zoned for rural-related business with a demonstrated need for a rural location.

Protections nearby 250 m

  • Recorded monument · 3
    Fulacht fia; R148057

Where this comes from

National planning feed (NPAD), fetched 21 Oct 2026, 02:10.

Source: National Planning Application Database · fetched 21 Oct 2026, 02:10
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:10open
Summary

2460787 is a planning application to Kildare County Council for for a Data Centre and will comprise of: The demolition of 3 no. dwelling houses, received on 13 Aug 2024; permission was granted with conditions on 20 Aug 2025.