Ballyviniter Lower, Mallow, Co. Cork, P51 AD76
Quiet street: 21 applications within 500 m since 2021.
What's planned, stalled or derelict around it.
Listed on daft.ie · Listed by Murphy Browne · no longer advertised (last seen 6 Nov 2026)
Planning around this home
| Description | Details | |||||||
|---|---|---|---|---|---|---|---|---|
| Granted (cond.) | 22 Dec 2022 | 22/6867 CORKCO | Ballyviniter Lower Mallow Co. Cork | Permission for retention for conservatory to side of existing dwelling as constructed on s… | 17 Apr 2023 | — | 0 m | |
| Appeal decided | 9 Aug 2024 | 24/5503 CORKCO | Polnareagha, Ardskeagh, Tullacondra, Croughta Kilmaclenine, Ballyclogh, Knockaunavaddreen, Copestown, Ballybeg, Baltydaniel East Twopothouse, Caurraghakerry, Co. Cork | The Applicant is seeking permission for the construction, operation and decommissioning of… | 22 May 2025 | — | 23 m | |
| Withdrawn | 28 Jun 2024 | 24/5215 CORKCO | Polnareagha, Ardskeagh, Tullacondra, Croughta Kilmaclenine, Ballyclogh, Knockaunavaddreen, Copestown, Ballybeg, Baltydaniel East Twopothouse, Caurraghakerry, Co. Cork | Permission for the construction, operation and decommissioning of a wind energy developmen… | — | — | 23 m | |
| Commenced | 11 Oct 2021 | 21/6750 CORKCO | Ballyviniter Lower Mallow Co. Cork | The construction of a proposed single storey extension to the rear of the existing dwellin… | 1 Dec 2021 | — | 32 m | |
| Commenced | 7 Sept 2023 | 23/5805 CORKCO | Ballyvinter Lower Mallow Co. Cork | Permission for 1- Construction of a new single storey extension to the side (South Facing)… | 1 Nov 2023 | — | 81 m | |
| Granted | 13 Jun 2023 | 23/5197 CORKCO | "Clonmore" Ballyviniter Lower Mallow Co.Cork | 1) the construction of 108 no. dwelling houses, consisting of 3 no. 4 bed detached, 2 no.… | 8 Aug 2023 | — | 89 m | |
| Commenced | 31 Jul 2025 | 25/5535 CORKCO | Brookville Ballyviniter Lower Mallow Co Cork | 1) Construction of a new single storey side extension. 2) Demolition of the existing garag… | 19 Sept 2025 | — | 116 m | |
| Granted (cond.) | 20 Apr 2022 | 22/4900 CORKCO | Ballyviniter Lower Mallow Co. Cork | Permission to retain garage attached to dwelling, alterations to dwelling, and all associa… | 29 Jul 2022 | — | 138 m | |
| Commenced | 14 Oct 2024 | 24/5932 CORKCO | 9 Clonmore Ballyviniter Lower, Ballyviniter Mallow Co.Cork | Permission for construction of new single storey front/side and rear extension. Alteration… | 5 Dec 2024 | — | 252 m | |
| Withdrawn | 20 Sept 2024 | 24/5787 CORKCO | 9 Clonmore Ballyviniter Mallow Co. Cork, P51D2NK | Permission for the construction of new single storey front / side and rear extensions. Mod… | — | — | 252 m | |
| Granted (cond.) | 1 Apr 2025 | 25/4564 CORKCO | 28 Clonmore Ballyviniter Lower, Ballyviniter Mallow Co.Cork | Permission for the construction of a single storey extension to the side of existing dwell… | 23 May 2025 | — | 346 m | |
| Withdrawn | 9 Jun 2022 | 22/5333 CORKCO | No. 28 Clonmore Ballyviniter Lower Mallow Co. Cork | Construction of a single storey dining / living extension to existing dwelling, conversion… | — | — | 346 m | |
| Refused | 2 May 2025 | 25/4831 CORKCO | Clonmore Ballyviniter Lower Mallow Co.Cork | Permission for the construction of 3 no. 2 storey detached dwelling house to replace 1 no.… | 26 Jun 2025 | — | 352 m | |
| Withdrawn | 7 Mar 2025 | 25/4390 CORKCO | Clonmore Ballyviniter, Ballyviniter Lower Mallow Co.Cork | Permission for the construction of 4 no. 2 storey dwelling houses, consisting of 2 detache… | — | — | 352 m | |
| Granted | 28 Sept 2023 | 23/5952 CORKCO | Hazel Brooke Spaglen Mallow Co.Cork | The construction of a strategic housing development comprising of 148 no. residential unit… | 17 Jan 2024 | — | 379 m | |
| Granted (cond.) | 26 Nov 2021 | 21/7201 CORKCO | No. 134 Cairn Woods Ballyviniter Lower Mallow Co. Cork | Permission for retention of adjoining canopy to rear of shed. | 27 Jan 2022 | — | 410 m | |
| Granted (cond.) | 22 Jul 2022 | 22/5737 CORKCO | Hazel Brooke Spa Glen Mallow Co. Cork | Installation of a 0.50m x 0.87m x 1.62m (LxWxH) above ground enclosure, to house a new nat… | 19 Oct 2022 | — | 483 m | |
| Withdrawn | 9 Jun 2022 | 22/5340 CORKCO | Hazel Brooke Parkadallane Co. Cork | Installation of a 0.50m x 0.87m x 1.62m (LxWxH) above ground enclosure, to house a new nat… | — | — | 483 m |
Full planning report
The full planning report for Ballyviniter Lower
Everything planned, built and refused around it, in one report you keep. Read it before you buy, build or object.
- 21 applications
- 14 granted




4 of about 30 pages, from a sample report in Blackrock.
Your report includes:
- Every application within 500 m: granted, refused and appealed, on a map
- What neighbours were allowed to build, and what was refused
- Deadlines to object, and sites nearby that could change
- New homes and developments coming, and building work started
- Zoning, conservation areas, protected structures and flood risk
- Questions to ask your solicitor or surveyor
VAT included · Secure checkout by Stripe · Opens straight after payment · PDF emailed to you
Not a statutory planning search.
About this home
Within 500 m of Ballyviniter Lower, Mallow, Co. Cork, P51 AD76, Planning Register tracks 21 planning applications: 14 granted, 1 refused, 4 building started. The home is a 4-bedroom bungalow in Ballyviniter Lower, Cork (BER C). It was advertised for sale on daft.ie until 6 Nov 2026; the advertisement has since been taken down.
More about this address
The site is zoned R2 — existing residential.
- Type
- Bungalow
- Bedrooms / bathrooms
- 4 / 1
- BER
- C
- Year built
- 1990
- Eircode
- P51 AD76
- Local authority
- Cork County Council
- Crèche inspected nearby
- ABC'S and 123's Pre- School · inspected 5 Dec 2024 (495 m)