PlanningRegister.ie
No longer advertised · 3 bed · 2 bath · 73 m² · BER C2

6 Quarry Road, Cabra, Dublin 7, D07 A2P0

Watch this: about 21 homes are approved 55 m away and not started. See the site →

about 21homes approved, not started55 m away
5 of 5extensions approved
Get the report

What to ask before you buy. First: what is planned for about 21 homes 55 m away?

Listed on daft.ie · Listed by Flynn Estate Agents · no longer advertised (last seen 11 Nov 2026)

Planning around this home

Distance
Time
Click a dot to open its row.
23 of 23 planning applications within 500 m in the last year · nearest first
DescriptionDetails
Open20 Oct 2026WEB3580/26
DCC
67, Annamoe Road, Cabra, Dublin 7, D07 XK71Existing single story flat roof structure to side demolished and replaced with an upgraded…—1 day left
24 Nov
262 m
Granted26 Feb 2026WEB1428/26
DCC
Glenart, 170 Cabra Road, Dublin 7, D07 A6C6The development will consist of alterations to the existing single story garage fenestrati…20 Apr 2026—204 m
Granted12 Jan 2026WEB1044/26
DCC
64, Annamoe Road, Dublin 7The development consists of the provision of external insulation to the front of the main…26 Feb 2026—230 m
Commenced27 Aug 2025WEB2973/25
DCC
33, Leix Road, Cabra, Dublin 7Planning permission is sought for single storey extension to front, side and rear of exis…23 Feb 2026—288 m
Open20 Oct 2026WEB3576/26
DCC
26 Offaly Road, Cabra Dublin 7, D07WR86RETENTION: Retention of a small frosted window serving an en-suite bathroom—1 day left
24 Nov
359 m
Granted18 Dec 2025WEB6044/25
DCC
81, Carnlough Road, Cabra West, Dublin 7, D07 P2P8New front vehicular access with dropped kerb including partial removal of front boundary w…19 Feb 2026—321 m
Granted16 Sept 20253386/25
DCC
77 Annamoe Road, Cabra, Dublin 7,D07WV67RETENION PERMISSION:The develeopment consists of: Single storey extension, garage and gard…21 Jan 2026—347 m
Open28 Oct 2026WEB3629/26
DCC
46, Caragh Road, Dublin 7, D07 P8P8The development will consist of alterations and extension to the existing two storey end o…—9 days left
2 Dec
429 m
Withdrawn15 Oct 2026WEB3535/26
DCC
26, Offaly Road, Dublin 7RETENTION: Retention of a small frosted window serving an en-suite bathroom.19 Oct 2026—359 m
Withdrawn27 Apr 2026WEB1982/26
DCC
26, Offaly Road, Dublin 7RETENTON: Retention of a small window serving an en suite bathroom together with all assoc…28 Apr 2026—385 m
Awaiting decision15 Oct 2026WEB3537/26
DCC
144, Annamoe Drive, Dublin 7The development will consist of (i) the enlargement and alteration of the existing single-…——476 m
Other28 Jul 2026WEB2862/26
DCC
Bus Stop 1804, Cabra Road, O/S Rosecourt Apartments, Dublin 7to replace the existing double-sided lightbox within the bus shelter with an advertising d…——412 m
Withdrawn7 Jul 2026WEB2678/26
DCC
Bus Stop 1804, Cabra Road,, at Rosecourt Apartment, Dublin 7To replace the existing double-sided lightbox within the bus shelter with an advertising d…9 Jul 2026—412 m
Granted25 Mar 2026WEB1694/26
DCC
105 Cabra Road, Dublin 7, D07 N2CKFull planning permission for the following works: alterations to previously approved plann…18 May 2026—420 m
Withdrawn19 Mar 2026WEB1638/26
DCC
105, Cabra Road, Dublin 7Full planning permission for the following works: alterations to previously approved plann…20 Mar 2026—420 m
Commenced20 Nov 2025WEB5729/25
DCC
75, Saint Jarlath Road, Cabra East, Dublin 7Planning permission is sought for new first floor extension to rear of existing house to i…23 Jan 2026—448 m
Commenced11 Feb 2026WEB1285/26
DCC
99a & 101 Cabra Road, Cabra, Dublin 7, D07W56RThe development will consist of (A) Change of use of 101 Cabra road from café use to retai…7 Apr 2026—450 m
Granted18 May 2026WEB2192/26
DCC
Park House, Grangegorman, 191 North Circular Road, Dublin 7, D07 EWV4Technological University (TU) Dublin intend to apply for permission for development at thi…8 Jul 2026—465 m
Granted28 May 2026WEB2298/26
DCC
58 Faussagh Road, Cabra East, Dublin 7The development will consist of the demolition of the existing chimney, the construction o…21 Jul 2026—466 m
Withdrawn22 May 2026WEB2239/26
DCC
58 Faussagh Road, Cabra East, Dublin 7, D07 N9E4The development will consist of the demolition of the existing chimney, the construction o…26 May 2026—466 m
Granted4 Feb 2026WEB1221/26
DCC
95a, New Cabra Road, Cabra, Dublin 7RETENTION PERMISSION: consists of adjustments to rear elevation glazing including placemen…31 Mar 2026—487 m
Withdrawn5 Jun 2026WEB2378/26
DCC
44, Inver Road, Cabra, Dublin 7, D07V2Y5To create a new front vehicular entrance with kerb dishing to facilitate off-street parkin…8 Jun 2026—492 m
Granted8 Apr 2026WEB1804/26
DCC
Saint Jude, 47 Drumcliffe Road, Dublin 7The development consists of: The proposed development comprises; Permission for removal of…29 May 2026—495 m

Full planning report

The full planning report for 6 Quarry Road

Everything planned, built and refused around it, in one report you keep. Read it before you buy, build or object.

  • 167 applications
  • 3 still open
  • 99 granted
Sample report page: Your questions, answered
Your questions, answered
Sample report page: Every application on a map
Every application on a map
Sample report page: Deadlines and sites that could change
Deadlines and sites that could change
Sample report page: Homes coming, appeals, building work
Homes coming, appeals, building work

4 of about 30 pages, from a sample report in Blackrock.

Your report includes:

  • Every application within 500 m: granted, refused and appealed, on a map
  • What neighbours were allowed to build, and what was refused
  • Deadlines to object, and sites nearby that could change
  • New homes and developments coming, and building work started
  • Zoning, conservation areas, protected structures and flood risk
  • Questions to ask your solicitor or surveyor

VAT included · Secure checkout by Stripe · Opens straight after payment · PDF emailed to you

Not a statutory planning search.

Open on the full map →

About this home

Within 500 m of 6 Quarry Road, Cabra, Dublin 7, D07 A2P0, Planning Register tracks 167 planning applications: 3 open for comments, 1 awaiting a decision, 99 granted, 7 refused, 45 building started. The soonest observation deadline is 24 Nov 2026 on DCC WEB3580/26 (67, Annamoe Road, Cabra, Dublin 7, D07 XK71). The home is a 3-bedroom semi-detached house in Cabra East B, Dublin of about 73 m² (BER C2). Derelict nearby: 122 Quarry Rd, 200 m.

More about this address

It was advertised for sale on daft.ie until 11 Nov 2026; the advertisement has since been taken down. The nearest named scheme is 52 & 54 Quarry Road, 64 homes, 54 m away.

Type
Semi-D
Bedrooms / bathrooms
3 / 2
Floor area
73 m²
BER
C2
Eircode
D07 A2P0
Local authority
Dublin City Council
Named schemes within 1.0 km
52 & 54 Quarry Road · 64 homes +7 more
Schools within 1.0 km
GAELSCOIL BHARRA (Gaelscoil · 212 pupils, 338 m) +7 more
Crèche inspected nearby
Happy Days · inspected 22 Jan 2025 (40 m)