Furroor , Lissycasey , Co Clare

To construct a Livestock Slatted Unit with associated ancilary siteworks

Observations close 9 Dec 2026 25 days left
5 weeks from receipt (received 4 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 7 Jan 2027

The application

Reference
26305 · full record
Authority
Clare County Council
Type
PERMISSION
Status
NEW APPLICATION
Site area
2,629 m²
Received
4 Nov 2026
Decision due
7 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/ClareCC/AppFileRefDetails/26305/0.
  2. Write your observation.Quote 26305 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Clare County Council takes it online with the submission or at the counter.
  4. Submit before 9 Dec 2026.Online through the register above, or in writing to the Planning Department, Clare County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2560792Conditional10 Feb 20261369 mto RETAIN the remedial works to the existing dwelling house. The renovations include raising the height of the ridge by 500mm, re-roofing the dwelling house, creating accommodation at first floor level, and PERMISSION is sought to complete all the internal renovations and connecting to existing services. PERMISSION is sought to upgrade the existing sewage treatment system. Permission is sought to RETAIN the mobile home on the site for the duration of the remedial works to the dwelling house and the removal of same on completion of the works
2560326Conditional20 Jan 20261342 mto erect dwelling house, waste water treatment system, percolation area, new site entrance and all associated works
24217Conditional2 Oct 20241140 mto construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
23290Conditional11 Jul 20230 mfor development at lands at Crossmore County Clare in the townlands of Furroor, Illaunatoo or Sorrelisand, Boolynakockaun and Booltiagh. The development will consist of: 1. Amendment to item (1) of Permitted Development Pl. Ref: 21/1057 to install a 38kV electrical connection over a total length of approximately 11km, from the permitted Crossmore Wind Farm (Pl. Ref: 09/123, as extended under Pl. Ref: 19/388 and altered by Pl. Ref: 20/284) to the entrance to the existing Booltiagh 110kV electrical substation. This amended connection will consist of: a. Revision to site boundaries as permitted under Pl. Ref: 21/1057; b. Removal of permitted overhead line from permitted polesets north of Local Road L2084 (previously numbered polesets 1-40 consented under Pl. Ref: 21/1057) for a distance of circa 4km and its replacement with c. 6.5km of underground electrical cabling along unnamed Local Roads. c. Relocation of permitted poleset number 40 (consented under Pl. Ref: 21/1057) 7m (meters) south. Redesign of poleset number 40 from double (as permitted under Pl. Ref: 21/1057) to triple (termination) poleset. The entirety of the grid connection from Crossmore Wind Farm to the existing Booltiagh 110kV electrical substation will therefore comprise c. 5.5km of overhead line (poleset numbers 41-93 conscented under Pl. Ref: 21/1057) c. 6.5km of underground cable (proposed under subject application) 2. Site Drainage 3. All associated site development and ancillary works. The application will be accompanied by a Natura Impact Statement (NIS)

What has happened on this file

  • 4 Nov 2026 New application · observations close 9 Dec 2026
  • 4 Nov 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 11 Nov 2026, 23:00. Not legal advice — confirm the deadline with Clare County Council before relying on it.