PlanningRegister.ie
Observation pack · Donegal County Council

AUGHT , TURE , THREE TREES LIFFORD PO

A PERIOD OF 10 YEARS AND 40-YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING OF THE ENTIRE WIND FARM WITH THE DEVELOPMENT TO CONSIST OF (1) ERECTION OF 6 NO. WIND TURBINES, EACH WITH A GENERATING CAPACITY OF 4.26MW TO 4.80MW WITH THE FOLLOWING PARAMETERS: (A) A TOTAL TIP HEIGHT RANGE OF 150M – 202M, (B) A ROTOR DIAMETER RANGE OF 133M – 138M, AND (C) A HUB HEIGHT RANGE OF 81M TO 135M, (2) CONSTRUCTION OF 6 NO. PERMANENT WIND TURBINE FOUNDATIONS, CRANE HARDSTAND AREAS AND TEMPORARY ASSEMBLY AREAS, (3) PERMANENT UPGRADE OF 1 NO. EXISTING ENTRANCE FOR CONSTRUCTION AND OPERATIONAL ACCESS TO THE WESTERN 3 NO. WIND TURBINE PARCEL FROM THE L-18111 PUBLIC ROAD, (4) PERMANENT UPGRADE OF 1 NO. EXISTING ENTRANCE FOR CONSTRUCTION AND OPERATIONAL ACCESS TO THE EASTERN 3 NO. WIND TURBINE PARCEL FROM THE L-18111 PUBLIC ROAD, (5) PROVISION OF C.2KM OF NEW SITE ACCESS TRACKS AND UPGRADE OF C.3.4KM OF EXISTING SITE ACCESS TRACKS TO FACILITATE ACCESS TO ALL ONSITE INFRASTRUCTURE, INCLUDING PASSING BAYS AND ALL ASSOCIATED DRAINAGE, (6) CONSTRUCTION OF 3 NO. TEMPORARY CONSTRUCTION COMPOUNDS WITH ASSOCIATED TEMPORARY OFFICES, STAFF FACILITIES PARKING, STORAGE AREAS AND SECURITY FENCING, (7) PROVISION OF 1 NO. PERMANENT METEOROLOGICAL MAST OF C.125M IN HEIGHT, AND ASSOCIATED FOUNDATION AND HARD-STANDING AREA, (8) ALL ASSOCIATED WIND FARM UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING, (9) PROVISION OF 3 NO. ONSITE BORROW PITS AND PERMANENT SPOIL STORAGE AREAS, (10) CONSTRUCTION OF JOINT BAYS AND ASSOCIATED COMMUNICATION CHAMBERS, (11) TURBINE DELIVERY WORKS ALONG THE L-18111 LOCAL ROAD, (12) PROVISION OF OPERATIONAL STAGE SITE SIGNAGE, (13) PROVISION OF HABITAT ENHANCEMENT AREAS AND (14) ALL ANCILLARY APPARATUS AND SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND, INCLUDING SOFT AND HARD LANDSCAPING AND UPGRADE OF EXISTING DRAINAGE INFRASTRUCTURE. A DESIGN FLEXIBILITY OPINION ISSUED BY DONEGAL COUNTY COUNCIL ON 31ST JULY 2026 ACCOMPANIES THIS APPLICATION. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT (NIS) ACCOMPANY THIS APPLICATION. THE DETAILS WHICH ARE UNCONFIRMED IN THIS APPLICATION ARE THE TURBINE TIP HEIGHT, ROTOR DIAMETER AND HUB HEIGHT. THE RANGE OF PARAMETERS UNDER WHICH THE TURBINE DIMENSIONS WILL FALL ARE SPECIFIED IN THE DESIGN FLEXIBILITY OPINION. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

Observations close 4 Dec 2026 18 days left
5 weeks from receipt (received 30 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 2 Jan 2027

The application

Reference
2662008 · full record
Authority
Donegal County Council
Type
PERMISSION
Status
NEW APPLICATION
Site area
133.00 ha
Received
30 Oct 2026
Decision due
2 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/DonegalCC/AppFileRefDetails/2662008/0.
  2. Write your observation.Quote 2662008 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Donegal County Council takes it online with the submission or at the counter.
  4. Submit before 4 Dec 2026.Online through the register above, or in writing to the Planning Department, Donegal County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2561945Conditional19 Dec 20250 mCONSTRUCTION OF A DETACHED DOMESTIC GARAGE / STORAGE SHED AND ASSOCIATED SITE DEVELOPMENT WORKS
2561859Conditional11 Dec 20255 mRETENTION, COMPLETION AND CHANGE OF USE OF DOMESTIC GARAGE (GRANTED UNDER REF NO: 16/51632) THAT IS UNDER CONSTRUCTION, TO A PROPOSED OFFICE, WORKSPACE AND STAFF TRAINING ROOM ON GROUND FLOOR AND A PRIVATE GAMES ROOM ON 1ST FLOOR WITH CONNECTION TO ALL EXISTING SERVICES
2460644Conditional20 Jun 20240 mERECTION OF AN EXTENSION TO EXISTING DWELLING HOUSE
2351117Conditional23 May 20240 mCONSTRUCTION OF A TWO STOREY PITCH ROOF EXTENSION TO THE SIDE OF THE EXISTING DETACTED BUNGALOW WITH PATIO, TERRACE AND 1 NO. DORMER ON THE ROOF, CONVERSION OF ATTIC OF THE EXISTING BUNGALOW WITH NO. 2 VELUXES AND 3 NO. DORMERS INCLUDING NEW REPLACEMENT WINDOWS AND ANY OTHER ASSOCIATED RENOVATION/BUILDING FABRIC WORKS/EXTERNAL WORKS
2450086Conditional2 May 20241170 m(1) DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE CONCRETE BLOCKWORK DOWN TO FOUNDATION LEVEL, (2) ERECTION OF A REPLACEMENT DWELLING HOUSE ON THE EXACT POSITION ON THE SITE BEFORE DEMOLITION, AND (3) ADDITION OF AN EXTENSION TO SOUTH SIDE ELEVATION, INTERNAL ALTERATIONS AND RECONNECTION TO EXISTING ONSITE TREATMENT PLANT AND ASSOCIATED SITE WORKS
2460102Conditional28 Mar 20240 m(1) ONE-STOREY DOMESTIC SHED/GARAGE AND (2) DEMOLITION OF EXISTING ONE STOREY DOMESTIC SHED AND ANY OTHER ASSOCIATED EXTERNAL WORKS
2351543Unconditional30 Nov 20230 mGRANT OF A 10 YEAR PLANNING PERMISSION FOR DEVELOPMENT OF A 14 TURBINE WIND FARM ON A SITE IN THE TOWNLAND OF AUGHT, APPROXIMATELY 5KM WEST OF QUIGLEY'S POINT. THE DEVELOPMENT WILL COMPRISE OF 14 NO ELECTRICITY GENERATING WIND TURBINES WITH A HUB HEIGHT OF 65 METRES AND A ROTOR DIAMETER OF 71 METRES GIVING AN OVERALL HEIGHT OF UP TO 100.5 METRES, HARDSTANDING, AN ELECTRICAL COMPOUND AND SUBSTATION BUILDING, ASSOCIATED SITE ROADS AND SITE WORKS. IT IS PROPOSED TO SOURCE ALL STONE FROM AN ON SITE BORROW PIT.
2350984Conditional24 Aug 20231495 mCONSTRUCTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT PLANT AND CONNECTION TO ALL PUBLIC SERVICES

Appeals

ACP caseTypeOutcomeDecidedDistance
312659Granted with conditions25 Feb 202525 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 30 Oct 2026 New application · observations close 4 Dec 2026
  • 30 Oct 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 11 Nov 2026, 23:00. Not legal advice — confirm the deadline with Donegal County Council before relying on it.