Oldmilltown , Kill , Co Kildare
For the construction of a barn comprising of 3 No stables Tack room, fodder storage area, dung stead , sand area, upgrade of existing farm entrance to fully recessed entrance and all site works
The application
- Reference
- 2661279 · full record
- Authority
- Kildare County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Site area
- 2.69 ha
- Received
- 18 Nov 2026
- Decision due
- 21 Jan 2027
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/KildareCC/AppFileRefDetails/2661279/0.
- Write your observation.Quote
2661279at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Kildare County Council takes it online with the submission or at the counter.
- Submit before 23 Dec 2026.Online through the register above, or in writing to the Planning Department, Kildare County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
Designations on or near the site within 100 m
- EPA-licensed facility × 1Returnbatt Limited
- Radon risk area × 1About 1 in 20 homes in this area is likely to have high radon levels
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Distance | Description |
|---|---|---|---|---|
| 2561382 | Refused | 5 Feb 2026 | 0 m | the construction of a barn comprising of 3 no stables , tack room, , fodder storage area, dung stead, sand area, upgrading of existing farm entrance and all associated site works |
| 2560597 | Refused | 19 Sept 2025 | 0 m | for construction of Barn, comprising of 3 no stables , tackroom, dungstead and sand exercise area. Revised by Significant Further Information which consists of: Change to redline boundary |
| 25120 | Conditional | 25 Aug 2025 | 318 m | to install a standby industrial diesel generator under proposed solar panels. The generator, to provide standby power generation, will incorporate a bunded fuel tank and be located within a mesh fence. The proposed solar panels will be attached to a steel frame to be erected over the generator (covering an area of approximately 22 sq.m., to a maximum height of 4.7 metres above ground level). Works to include all ancillary development works, all located within an existing fenced compound |
| SD24B/0544 | Grant retention & refuse retention | 6 May 2025 | 480 m | Retention of conversion of garage to Granny Flat and for alterations to recessed entrance |
| SD24B/0434 | Invalid - site notice | 18 Oct 2024 | 480 m | Retention of conversion of garage to granny flat and for alterations to recessed entrance |
| 2460226 | Conditional | 20 Aug 2024 | 169 m | of a single-storey extension to the side of the existing single-storey dwelling and planning permission for (a) decommissioning of existing septic tank and soakpit, (b) installation of new treatment system and percolation area along with all associated site development and facilitating works |
| 2360356 | Conditional | 4 Jul 2024 | 0 m | for fully recessed farm entrance |
| 23276 | Conditional | 11 May 2023 | 141 m | for a second phase of the existing grid system services facility within the existing grid system services facility within the existing site area of c1.95 hectares, which was granted via reference number 18/247. The second phase will utilise all existing infrastructure, including the EirGrid gird connection infrastructure, site roads, 110kV substation, compounds, and all ancillary services. The proposed new works will consist of the installation and operation of battery energy units, including 1 no. customer switchgear container which will be connected to the national grid, via the existing infrastructure ,electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure on land at |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 322642 | Planning Appeal | Refused | 1 Oct 2025 | 480 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 18 Nov 2026 New application · observations close 23 Dec 2026
- 18 Nov 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 24 Nov 2026, 23:00. Not legal advice — confirm the deadline with Kildare County Council before relying on it.