Planning Register
Observation pack · Meath County Council

Nuttstown , Kilbride , Co. Meath

the development will consist of removal of existing extension and adjoining buildings, construction of new rear extension; alterations to existing house; new waste water treatment system and percolation area, new front boundary treatment including revised driveway access and all related site works

Observations close 18 Sept 2026 6 days left
5 weeks from receipt (received 14 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee 20 · council decision due 8 Oct 2026

The application

Reference
2661026 · full record
Authority
Meath County Council
Type
PERMISSION
Status
PRE_VALIDATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
Site area
2,080 m²
Received
14 Aug 2026
We first saw it
11 Sept 2026, 18:51
Decision due
8 Oct 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/MeathCC/AppFileRefDetails/2661026/0.
  2. Write your observation.Quote 2661026 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Meath County Council takes it online with the submission or at the counter.
  4. Submit before 18 Sept 2026.Online through the register above, or in writing to the Planning Department, Meath County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

  • Radon risk area × 1
    About 1 in 20 homes in this area is likely to have high radon levels
  • OPW flood extent nearby floodinfo.ie
    Shown as a flag only — the OPW licence does not allow us to redistribute the extent.

1 layer present but masked: flood_nifmsource licence forbids redistribution (CC-BY-NC-ND); shown as a boolean and a link only

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2561248Refused25 May 202600 mthe development will consist of construction of a single storey dwelling house, a domestic garage, alteration to existing entrance from public road, wastewater treatment system and percolation area, and all ancillary site works. Significant further information/revised plans submitted on this application
2561031Conditional24 Feb 20261207 mthe development will consist of a Single storey dwelling with a suitable wastewater treatment unit and associated site works. Significant Further Information/Revised Plans submitted on this application
2455Refused5 Apr 202420 mthe development will consist of an application to construct a bungalow dwelling house, a domestic garage, a combined entrance from the public road, a waste water treatment system and percolation area to the EPA recommendation 2021, connection to existing water supply, together with all works ancillary to the overall development
221360Refused8 Dec 2022211 mprevious planning reference AA/190436 and 21/1768. The development will consist of an application to construct a bungalow dwelling house, a domestic garage, a combined from the public, a waste water treatment system and percolation area to the EPA recommendation 2021, connection to existing water supply, together with all works ancillary to the overall development
212232Conditional27 Jan 20221377 malterations to previously approved planning Reg. Ref. AA/190888 which relates to the relocation of the vehicular entrance from the public road and a change in house type with associated site works
211768Refused2 Nov 2021116 mthe development will consist of an application to construct a bungalow dwelling house, a domestic garage, an entrance from the public road, a waste water treatment system and percolation area to the EPA recommendation 2021, connection to existing water supply, together with all works ancillary to the overall development

Appeals

ACP caseTypeOutcomeDecidedDistance
319422Electricity Development ApplicationGranted with conditions5 Feb 20250 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 14 Aug 2026 New application · observations close 18 Sept 2026
  • 14 Aug 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 11 Sept 2026, 18:51. Not legal advice — confirm the deadline with Meath County Council before relying on it.