PlanningRegister.ie
Observation pack · Offaly County Council

Lumcloon , Cloghan , Co. Offaly

Demolishing 2 No. existing semi-detached single storey dwellings and outbuildings/sheds and permission for 2 No. detached replacement single storey dwellings, 2 No. revised site entrances, 2 No. detached garages, 2 no. treatment systems and percolation areas and all associated site works

Observations close 10 Dec 2026 22 days left
5 weeks from receipt (received 5 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 8 Jan 2027

The application

Reference
2660576 · full record
Authority
Offaly County Council
Type
PERMISSION
Status
NEW APPLICATION
Units
2
Floor area
553 m²
Site area
2,524 m²
Received
5 Nov 2026
Decision due
8 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/OffalyCC/AppFileRefDetails/2660576/0.
  2. Write your observation.Quote 2660576 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Offaly County Council takes it online with the submission or at the counter.
  4. Submit before 10 Dec 2026.Online through the register above, or in writing to the Planning Department, Offaly County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedDistanceDescription
2460485Conditional6 Feb 2025226 mThe proposed development includes the construction of the following: (i) two new independent power provider (IPP) buildings, (ii) two new electrical transformers, (iii) additional air insulated switchgear (AIS) including four new 110kV bays, (v) connection to the grid via the existing 110kV Derrycarney substation, (vi) access to the site is proposed through an upgraded existing entrance onto the R357 regional road consented under planning reference 23/60111 and through the existing Derrycarney 110kV Substation entrance, (vii) all civil engineering works, drainage, internal roads, landscaping, lighting, temporary construction compound and security fencing.
2360111Conditional6 Feb 2024216 man extension to the existing battery energy storage system (BESS) facility (consented under Planning Ref 19/55) the proposed development includes the construction of the following: (i) Open area battery energy storage system (BESS) on lands adjoining the existing BESS facility to the east and south, containing a total of 112 modular battery containers and medium voltage power stations (MVPS). The proposed development will utilise the existing customer (IPP) building and electrical infrastructure to connect to the grid via the 110kV Derrycarney transmission substation, which adjoins the BESS facility, (ii) Access to the site is proposed through an upgraded existing entrance onto the R357 regional road, (iii) All civil engineering works, drainage, internal roads, landscaping, lighting and security fencing.
2320Refused22 Mar 2023377 mDEVELOPMENT OF A SOLAR PHOTOVOLTAIC (PV) ENERGY DEVELOPMENT.THE PROPOSED SOLAR PV ENERGY DEVELOPMENT IS CONTAINED WITHIN TWO DISTINCT PARCELS OF LAND, REFERRED TO AS ZONE 1 AND ZONE 2. THE OVERALL DEVELOPMENT SITE OF C. 247 HECTARES WILL CONTAIN: (I) SOLAR PV PANELS ON GROUND MOUNTED FRAMES /SUPPORT STRUCTURES WITHIN EXISTING FIELD BOUNDARIES, (IÎ) 30 NO. MEDIUM VOLTAGE POWER STATION (MVPS) ENCLOSURES (6.058M LONG X 2.348M WIDE X 2.896M HIGH), (III) 6 NO. WEATHER MONITORING STATIONS, (IV) 2 NO, TEMPORARY CONSTRUCTION COMPOUNDS (50M LONG X 35M WIDE), (V) INTERNAL SITE ACCESS TRACKS AND UNDERGROUND CABLES (UGC), (VI) UGC IN THE PUBLIC ROAD NETWORK (L70095, L70099, L70208-3 & R357), WHICH WILL ELECTRICALLY CONNECT THE DEVELOPMENT TO THE DERRYCARNEY 110KV SUBSTATION LOCATED WITHIN THE TOWNLAND OF LUMCLOON, AND (VII) ALL ANCILLARY DEVELOPMENT, INCLUDING; PERIMETER FENCING WITH ACCESS GATES AT VEHICLE SITE ENTRANCES ALONG PUBLIC ROADS (L70095 AND THE R357), CCTV SECURITY CAMERAS, LANDSCAPING, AND ALL ASSOCIATED CIVIL ENGINEERING WORKS, PLANNING PERMISSION IS BEING SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND ACCOMPANIES THIS PLANNING APPLICATION

Appeals

ACP caseTypeOutcomeDecidedDistance
322004Granted with conditions7 Jul 2025226 m
316303Granted with conditions19 Apr 2024378 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 5 Nov 2026 New application · observations close 10 Dec 2026
  • 5 Nov 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 17 Nov 2026, 23:00. Not legal advice — confirm the deadline with Offaly County Council before relying on it.